Project Overview

Project Overview. $111 million Lump Sum Design Build LEED Platinum, Net Zero minus 10% 58% better than ASHRE 90.1 for energy use 21 Month Schedule to achieve $450k bonus 52 Acre Site with FEMA Flood Wall 203,000 SF Office Building – 6 floors 150,000 SF Maintenance Buildings.

piera
Download Presentation

Project Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Overview • $111 million Lump Sum • Design Build • LEED Platinum, Net Zero minus 10% • 58% better than ASHRE 90.1 for energy use • 21 Month Schedule to achieve $450k bonus • 52 Acre Site with FEMA Flood Wall • 203,000 SF Office Building – 6 floors • 150,000 SF Maintenance Buildings

  2. Design Strategy for “Highest Attainment” • Everything possible within scope and budget • Think Life Cycle Cost / Total Cost of Ownership • Longest tolerable ROI (don’t leave anything on the table) • Don’t micromanage the line items – look for design synergies within overall budget

  3. Maximize Energy Efficiency Strategies • Start with demand reduction (the “art” of architecture) • Envelope • Lighting / daylighting • Optimize MEPS • Controls, M&V (in real time) • Only then go to onsite renewables (effective but expensive) • Train O&M staff

  4. Maximize Water Efficiency Strategies • Reduce demand • Reduce potable use • Maximize rainwater and storm water capture • Maximize reuse of process water • Don’t forget the “energy cost of water”

  5. No Added Cost for Energy Efficiency

  6. Phipps Center for Sustainable Landscape Geothermal System RTU • Energy Recovery Wheel • Merv 13 Filters • UV Lighting PV Array Vertical Wind Turbine Green Roof Rainwater Harvesting • Underground cisterns • Rain Tanks Constructed Wetlands • Wetland Treatment Cells • Sand Filtration • UV Light Rain gardens Bio-retention Permeable Paving Hydronic Radiant Heating

  7. Phipps - Energy Efficiency Goals • Achieve ILBI Living Building Challenge certification • Exceed LEED® Platinum certification criteria • Reduce annual energy usage by at least 50% in comparison to a traditionally-designed building • Reduce capacity requirements for HVAC systems and associated infrastructure (power, pipes, ductwork, pumps, etc.) by 30-40%

  8. Phipps Energy Efficiency Strategies • Passive Solar Design • Robust Building Envelope • Geothermal Heating and Cooling • Rooftop Energy Recovery Unit • Desiccant Dehumidification • Building Management System (BMS) • Solar PV and Solar Hot Water Collectors • Vertical Axis Wind Turbines • Natural Ventilation • Demand Controlled Ventilation (DCV) • Minimally Conditioned Atrium

  9. Thank YouQuestions?mdeane@tcco.com