An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EU Energy R&D FundingDavid McAuleyR&D Programme Manager,SEAI13th June 2011HMRC

  2. Agenda • NER300 • FP7 • Further • Information • Q&A

  3. Path to Commercialisation NER300 DG Climate Action / EIB FP7 ENERGY-1 DG Research and Innovation ENERGY-2 DG Energy

  4. NER300 - OceanDavid McAuleyR&D Programme Manager, SEAI13th June 2011HMRC

  5. NER300 Funding • EU Emissions Trading Scheme • NER - New Entrants Reserve • 300 – 300 Million Carbon Credits • Approx €4.5 Billion

  6. What’s Included “Pre-commercial demonstration of renewable technologies“ • Innovation is an eligibility criteria: projects must be innovative in nature. • Ranking is based on cost per unit performance • Projects expected to produce energy by end of 2015.

  7. What’s Included? • 8 CCS projects • 34 RES projects, of which: • 9 Bio-energy • 5 CSP • 3 PV • 6 Wind • 4 Geothermal • 3 Ocean • 1 Hydro • 3 Distributed Renewables Management (SmartGrids)

  8. NER300 – OCN Category • 3 Ocean (OCN) Sub Categories: • Wave energy devices with nominal capacity 5 MW • Marine/tidal currents energy devices with nominal capacity 5 MW • Ocean thermal energy conversion (OTEC) with nominal capacity 10 MW

  9. Terminology • Reference Plant:Alternative plant on which extra Investment and operation costs are measured. • Relevant Costs: Extra investment costs + extra operating costs – extra operating benefits • NER300 will finance 50% of relevant costs • Financing under NER300 can be combined with Structural Funds, EEPR and RSFF. • Payments. Financing to be disbursed on a yearly basis during 1st 5 years of operation by the MS, as a function of the amount of energy produced.

  10. Relevant Costs

  11. Relevant Costs

  12. Cost Per Unit Performance(CPUP) NER300 (MS) “Cost” per (projected) Unit Performance Pre-existing Support Schemes

  13. Application Process • 9th Nov 2010 - Call announced • 9th Feb 2011 - Submit to Member State (DCENR) • 9th May 2011 – Forward to EIB • 20th June 2011 – EIB 6-Week Report • 9th Aug 2011 – EIB 3-month report • 9th Nov 2011 – EIB 6-month report • 9th Feb 2012 – EIB 9-month report • Decision – Mid 2012

  14. Application Process Commission Member State Project Sponsor EIB Final Decision MS Submission 6-week report 9-month report 6-month report 3-month report Develop Proposal

  15. Stage 1 Submissions • EU: • 13 CCS Projects • 65 RES Projects • Ireland: • 2 RES Projects • 1 Ocean • 1 Bioenergy

  16. More information EU Website: http://ec.europa.eu/clima/funding/ner300/index_en.htm

  17. FP7 Energy 2012David McAuleyR&D Programme Manager, SEAI13th June 2011HMRC

  18. FP7 Energy • Annual calls for proposals 2007 – 2013 • 2011 Call closed • 2012 Call launch July 2011 • Collaborative Projects • Shared Cost • €260 Million for 2012

  19. FP7 ENERGY 2.6: OCEAN ENERGY 2012.2.6-1: Demonstration of first ocean energy farms (two projects) 3MW or over, devices of the same type, grid connected, reduce cost, improved reliability and efficiency, lower O&M costs. Call Launch: 20th July 2011 Deadline: 8th March 2012 Single stage evaluation Note scale: €24 Million for “Renewable Electricity Generation” – across 12 projects Demonstration Project

  20. FP7 ENERGY 2012 Call for Tenders: Study on the environmental impacts of noise, vibrations and electromagnetic emissions from marine renewables. €1,000,000 Q3 2011, 12 Months Duration Coordination and supporting action

  21. Energy Research PortalHMRC13th June2011

  22. Energy Research Portal • 21 academic institutions surveyed • Over 250 Principal Investigators • 700+ projects • €174 million funding • 14 collaborative clusters

  23. Research Funding • Main Funding Categories: • Total €174 million • Irish Government* • European Union: • FP6 & FP7 • EURATOM • INTERREG • UK Government (NI) • Industry • International • *Irish Government: • Total €128 million • Science Foundation Ireland (SFI) • Enterprise Ireland (EI) • Sustainable Energy Authority of Ireland (SEAI) • Environmental Protection Agency (EPA) • Marine Institute (MI) • HEA, IRCHSS, IRCSET • DEHLG, DAFF, COFORD, COMHAR • Teagasc

  24. Irish Energy Research Map - Low Carbon Technologies 13 main categories Solar Energy Wind Energy Energy Storage Marine Energy Geothermal Energy Policy & Analysis Energy Research Low Carbon Technologies Carbon Capture & Storage Transport, Fuel Cells & Hydrogen Bioenergy Other Waste to Energy Electrical Grid Energy Efficiency

  25. Funding => University => Technology Source University

  26. Funding => Universities => Technology Sources

  27. Academic Energy ResearchFunding by Technology Category over 2004 – 2010

  28. Academic Energy ResearchFunding by Institution 2004 – 2010Total €174 million

  29. Research Portal

  30. http://research.seai.ie

  31. Questions?HMRC13th June 2011

  32. EU Energy R&D FundingDavid McAuleyR&D Programme Manager, SEAI13th June 2011HMRC