Production & Maintenance

Production & Maintenance. Steven J. Durand Thursday - May 20, 2004. Manufacturing Goals. Out-source board assemblies Ready the facility for manufacturing Build modules in-house as needed Maintain the Schedule . Board Design Education. GTC in-house training (6 hrs)

piper
Download Presentation

Production & Maintenance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production & Maintenance Steven J. Durand Thursday - May 20, 2004 LO/IF/FO - May 19-20, 2004

  2. Manufacturing Goals Out-source board assemblies Ready the facility for manufacturing Build modules in-house as needed Maintain the Schedule LO/IF/FO - May 19-20, 2004

  3. Board Design Education • GTC in-house training (6 hrs) • PROTEL & PADS training • OJT during prototype stage • Small runs • Multiple vendors • Planned for numerous revisions LO/IF/FO - May 19-20, 2004

  4. Final Circuit Boards • Designed for automated assembly • PROTEL, PADS & ORCAD • Multi-layer boards (6-14) • BGA, surface mount components • Components on both sides • Ready for Out-Sourcing LO/IF/FO - May 19-20, 2004

  5. NRAO will Provide: • Basic Ordering Agreement, 1-2 years • Long term commitment • Software designs and BOMs • Design reviews with vendors • Dedicated test fixtures LO/IF/FO - May 19-20, 2004

  6. Board Vendor Provides: • Fully assembled boards • Partially tested • Flying probe tests – NRAO test fixtures • ESD packaged and labeled • Scheduled deliveries • Hazardous chemical handling LO/IF/FO - May 19-20, 2004

  7. In-house Module Assembly Preparation • Trained staff • Same team that built the prototypes • Complete assembly drawings • New soldering stations • Test equipment & computers in place LO/IF/FO - May 19-20, 2004

  8. ESD Preparation • 12 ESD stations including floor mats • ESD totes and parts bins • ESD shoes and wrist straps • Humidity controlled facility • Parts bins by area LO/IF/FO - May 19-20, 2004

  9. Planning for Small Production Runs • Goal is to produce 28 similar antennas • Small quantity builds, 5-10 at a time • AOC warehouse completed modules (not a parts warehouse) • Small machine shop in AOC LO/IF/FO - May 19-20, 2004

  10. Quality Control • Producing written QA procedures • Software support of LabView MIB open architecture Bench test fixtures • MainSaver Maintenance Software LO/IF/FO - May 19-20, 2004

  11. Quality Tools • Shaker Table • Environmental Chamber • EVLA Test rack • Enhanced real-time monitoring • Red/Green tag procedures LO/IF/FO - May 19-20, 2004

  12. Inventory Control • New and old warehouse managed by Skip Lagoyda, Business Manager • JD Edwards software Quantity, re-order mechanisms LO/IF/FO - May 19-20, 2004

  13. Attributes of In-house Module Assembly • Minimize storage problems • Tight engineering control • Correct mistakes, perfect design • Fast turn-around time LO/IF/FO - May 19-20, 2004

  14. Module Attributes • Meets Scientific Requirements • RFI quiet • Cost effective “It takes Twenty Years to make an overnight Success” - Eddie Cantor LO/IF/FO - May 19-20, 2004

  15. RFI Mitigation • Goal: Minimize RFI at the source • Board level design control MIB test results –20 dB lower • In-house RFI chamber “Test as you build” LO/IF/FO - May 19-20, 2004

  16. RFI Module Design • No front panel penetrations • Internal barrier plate • Double RFI gasket • RFI air filters • EVLA motto: • “Too Many Screws” LO/IF/FO - May 19-20, 2004

  17. Suppression Success • Present hardware meets design spec • DTS module over 60 dB of attenuation • Cost Saving considerations: • May not need double spiral gasket • Will not need DTS H-rack LO/IF/FO - May 19-20, 2004

  18. Cost Saving Techniques • Prototype using coaxial components • Production using MMICS, surface mount RF components • Extensive use of COTS equipment • 48 Volt power supplies • Ethernet switches • Optical communications equipment LO/IF/FO - May 19-20, 2004

  19. Cost Saving Continued • Low Risk, Large Procurements • Best price strategy • Minimize obsolescence costs • Freezes the design LO/IF/FO - May 19-20, 2004

  20. Purchasing Support • Large procurement forecast • Competitive bid procedures creative selection criteria allows for best vendors – not only lowest price • BOA, Blanket Orders • Negotiated warranties Balanced with in-house testing LO/IF/FO - May 19-20, 2004

  21. Budget vs. Cost • Actual costs are now used for budgeting “To be a Success Be Daring, Be First, Be Different.” Marchant LO/IF/FO - May 19-20, 2004

  22. Appropriate Funding Allocation – DTS Example • Formatter board parts cost: $9,559.79 (Qty - 10) • Includes $152.16 cost for assembly & test • Includes $6,600 for 3 transponders • Bogue Machine parts $2,640  (Qty – 4) • Spira Honeycomb filters $442 per DTS Total $12,641 LO/IF/FO - May 19-20, 2004

  23. DTS Example Continued • Estimated Costs (excluding samplers) Power supply board, VICOR bricks $2,700 MIB and digital board $1,500 Optical hardware $ 600 • Total ~ $17,440 ea ($69,764 per antenna) Current WBS estimate $72,000 • In-House Assembly/Test Labor $4,000 LO/IF/FO - May 19-20, 2004

  24. WBS Budget Management Tool • Detailed budgets have been developed and are backed by actual cost data • Quarterly reviews • Managed cash flow and work load LO/IF/FO - May 19-20, 2004

  25. If it all goes wrong? LO/IF/FO - May 19-20, 2004

  26. Advantages of a Software Instrument • Software reconfigurable: • FPGAs in most modules • MIB data collection and processing in each module • MIB module control LO/IF/FO - May 19-20, 2004

  27. De-scope Options Identified • Fewer wide band receivers U-band & S-band • Reduce the DTS band width 120 Gbits/sec → 60 Gbits/sec • Reduces configuration uncertainty LO/IF/FO - May 19-20, 2004

  28. We are Ready for Production • Tested designs • Outsourcing commitment • Cost saving steps in place • COTS parts & equipment • Contingency Plans LO/IF/FO - May 19-20, 2004