240 likes | 445 Views
January 29, 2003. PBOG MeetingMidland, Texas. 2. Test Well Facilities. The Texas Tech University Test Well Facilities continues the procurement stage of the production facilities.Donations have been secured for the following items.Two-Phase separator and Heater Treater from NATCO GROUP.Lufkin C
E N D
1. January 29, 2003 PBOG Meeting
Midland, Texas
2. January 29, 2003 PBOG Meeting
Midland, Texas 2 Test Well Facilities The Texas Tech University Test Well Facilities continues the procurement stage of the production facilities.
Donations have been secured for the following items.
Two-Phase separator and Heater Treater from NATCO GROUP.
Lufkin C456D-305-144 Pumping Unit with Pump off Controller.
Ajax Gas Compressor from Universal Compression
VSD for ESP and Pumping unit from ABB
Sucker Rod wellhead assembly from R&M Energy systems
3. January 29, 2003 PBOG Meeting
Midland, Texas 3 Donated Equipment Specifications
Lufkin Pumping Unit
C456D-305-144
Pump off Controller
Contact:
Mr. Cecil L. Hunt Jr.Lufkin Industries, Inc.
Oilfield Division
P. O. Box 849
Lufkin, Texas 75902-0849
Phone:(936) 637-5667
Fax: (936) 637-5306
Email: chunt@lufkin.com
4. January 29, 2003 PBOG Meeting
Midland, Texas 4 Lufkin Pumping Unit PadRed Raider No. 1
5. January 29, 2003 PBOG Meeting
Midland, Texas 5 Donated Equipment Specifications NATCO GROUP
Two Phase Separator
16 in x 5 ft x 1440 psi.
800 bbls of Fluid per day
Contact Information:
NATCO ODESSA
6609 West 16th Street
Odessa, Texas 79763
Phone: (915) 530-3600
Fax: (915) 530-3636
6. January 29, 2003 PBOG Meeting
Midland, Texas 6 Donated Equipment Specifications NATCO GROUP
Heater Treater
4 ft x 20 in. x 50 psi
860 bbls of Fluid per day
Contact Information:
NATCO ODESSA
6609 West 16th Street
Odessa, Texas 79763
Phone: (915) 530-3600
Fax: (915) 530-3636
7. January 29, 2003 PBOG Meeting
Midland, Texas 7 Red Raider No. 1 Equipment (Awaiting Delivery) Stock Tanks (Permian Tank Company, Odessa, Texas)
Three (3) 12ft x 25 ft, API 12F Type B Cone bottom, tanks with ź inch plate and 1 in roll lines.
OCTG Pipe (Tubing)
Five Star Pipe (Odessa, Texas) 4150 ft, 2-7/8 inch, J-55, 6.5 #/ft, R2, SCC
Cont. Casing (Houston, Texas) 1500 ft, 3-1/2 inch, J-55, 9.30 #/ft, R2, SCC
Cont. Casing (Houston, Texas)
4150 ft, 1.315 inch, J-55, R2, EUE
8. January 29, 2003 PBOG Meeting
Midland, Texas 8 Red Raider No. 1 Equipment (Awaiting Delivery, Feb 1st)
9. January 29, 2003 PBOG Meeting
Midland, Texas 9 Toshiba Oil Field Motor and Cutler Hammer Panel
10. January 29, 2003 PBOG Meeting
Midland, Texas 10 R&M Energy Systems EquipmentSucker Rod Pumping
11. January 29, 2003 PBOG Meeting
Midland, Texas 11 Pipe RacksRed Raider No. 1
12. January 29, 2003 PBOG Meeting
Midland, Texas 12 Utility Easements (Water, Electric, Gas, Data)Fence Line
13. January 29, 2003 PBOG Meeting
Midland, Texas 13 LP&L Electric (12,100 Volt)
14. January 29, 2003 PBOG Meeting
Midland, Texas 14 ATMOS Gas Line
15. January 29, 2003 PBOG Meeting
Midland, Texas 15 Location Preparation (Gas Pipeline)
16. January 29, 2003 PBOG Meeting
Midland, Texas 16 Location Preparation (Water Well)
17. January 29, 2003 PBOG Meeting
Midland, Texas 17 Butchs Rat Hole (Guy Line Anchors)
18. January 29, 2003 PBOG Meeting
Midland, Texas 18 Location Preparation (Location Prep.)
19. January 29, 2003 PBOG Meeting
Midland, Texas 19 Lease Sign SWR No. 3
20. January 29, 2003 PBOG Meeting
Midland, Texas 20 Test Well Web Page (1)
21. January 29, 2003 PBOG Meeting
Midland, Texas 21 Test Well Web Page (2)
22. January 29, 2003 22 Corporate Project Sponsors
23. January 29, 2003 PBOG Meeting
Midland, Texas 23 Test Well Facilities Schedule We are currently waiting on the split hanger for the tubing head.
We hope to have the Lufkin Unit set by Feb. 1, 2002.
We will move tubing to the racks after the pumping unit is set.
The Separation facilities and stock tanks will be ready by the end of May 2003.
We hope to have the pumping unit component ready for testing by May 2003.
24. Test Well Facilities