1 / 12

44095: IT for Management

44095: IT for Management. Review & Part 2 Requirements By: Ian Perry Room: C41C E-mail: i.p.perry@hull.ac.uk Tel: 01723 35 7287 http://itsy.co.uk/ac/0708/Sem2/44095_IT4M/. IT4M: Learning Outcomes?. Understand the distinction between data, information & knowledge.

polly
Download Presentation

44095: IT for Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 44095: IT for Management Review & Part 2 Requirements By: Ian Perry Room: C41C E-mail: i.p.perry@hull.ac.uk Tel: 01723 35 7287 http://itsy.co.uk/ac/0708/Sem2/44095_IT4M/

  2. IT4M: Learning Outcomes? • Understand the distinction between data, information & knowledge. • Relate theoretical information technology models to business organisations, in order to understand business needs. • Assess an organisation, to identify the role of IT-based support systems in a given business context. • Use software tools to produce a working example of an IT-based support system which addresses specific business needs.

  3. IT4M: Assessment Method? • A single assignment, in two-parts, based upon the ‘EZPC’ Case Study scenario. • Part 1 • Analyse the current information system, as presented by the Case Study, using appropriate systems diagrams. (30 Marks) • Where, and how, might Information Technology (IT) be used to improve the efficiency and/or effectiveness of Case Study organisation’s information system? (20 Marks) • Part 2 • Build a software tool that can help improve a specific aspect of the information system for the Case Study organisation. (50 Marks)

  4. EZPC – Case Study • EZPC assemble PC Systems for sale to customers such as PC World, Dixons, Currys, etc. • Each PC System is ‘made-to-order’ (as a result of a request from a specific customer), based on a limited set of ‘Standard’ PC Configurations. • The computer components (i.e. Processors, Hard Disks, Memory, etc.), from which the PC systems are assembled, are purchased from a number of suppliers. • EZPC also sells computer components directly to the same Customers. • The components, either waiting to be assembled into PC Systems, and/or to be passed on directly to EZPC’s customers, are stored at one of three different warehouse locations, i.e.: • Leeds, Newcastle, & Reading • The Leeds Warehouse acts as the Head Office for EZPC; • all dealings with suppliers are controlled from the Head Office. -- SNIP --

  5. EZPC – Continued • At each Warehouse -- SNIP –- • A fourth group of staff control the warehouse operations; ordering & receiving components from suppliers, -- SNIP –- • How things work? -- SNIP –- • If a ‘work order’ can not be completed, due to a lack of components, then the Warehouse must raise a ‘purchase order’ (via the Head Office) with one of EZPC’s Suppliers. -- SNIP --

  6. EZPC – Problems? -- SNIP –- • Each of the Warehouses is quite small, and can only hold a small stock of computer components and assembled PCs, so ‘work orders’ often become ‘purchase orders’ (once again a manual calculation). • Raising a ‘purchase order’ with one of EZPC Suppliers can result in a delay of up to 10 days for the delivery of the computer components. • Often, even when Warehouse is almost full of computer components, a ‘work order’ cannot be completed; • as these are the wrong components with which to satisfy a specific customer ‘request’.

  7. Case Study Update - 1 • Stella, the Manager in charge of purchasing stock for EZPC, often ‘gets it wrong’, i.e.: • buys too many of those components for which the demand is low. • does not buy enough of those components for which the demand is high. • At a recent business seminar, someone told Stella that all she needs to do is to work out the Economic Order Quantity (EOQ) for every component that EZPC stocks. • This person kindly provided Stella with a ‘simple’ formula (see next slide) for working out EOQ, but she is having trouble using it.

  8. Economic Order Quantity? • The kindly person also said that it is not always prudent to order the exact EOQ that is indicated by the above formula; • and suggested that it might also be wise to create an EOQ Optimisation Table & Chart (see next 2 slides), for a range of possible re-order amounts. • A ‘simple’ EOQ Formula

  9. EOQ Optimisation Table • You need to build a table of calculations, for a variable range of Re-order Amounts (R); • e.g. 5, 10, 15, 20, etc. • Then calculate the following for each value of R: • Annual Holding Cost (AHC) = HC x (R/2) • Annual Ordering Cost (AOC) = OC x (D/R) • Total Annual Cost (TAC) = AHC + AOC • And present them in a table like this:

  10. EOQ Optimisation Chart • Producing a line chart of the data from the EOQ Optimisation Table; should result in something like this: NB. The Point at which the AHC and AOC curves cross is the EOQ, however; the TAC curve is usually relatively flat either side of this point, which shows how much more, or less, can actually be re-ordered without having a major effect on the TAC.

  11. What you have to do? • The spreadsheet you develop should be as easy to use as possible, so: • use multiple worksheets; • in order to separate input, lookup & output areas. • use named ranges & simple macros; • in order to automate the process of moving between worksheets, and printing specific sections of worksheets. • make your data entry worksheet as ‘bullet-proof’ as possible; • as mistakes in data entry are the biggest cause of error with any IT-based ‘solution’.

  12. The Assignment & Deadline? • A single assignment, in two-parts, based upon the ‘EZPC’ Case Study. • Part 1 • Analyse the current information system, as presented by the Case Study, using appropriate systems diagrams. (30 Marks) • Where, and how, might Information Technology (IT) be used to improve the efficiency and/or effectiveness of Case Study organisation’s information system? (20 Marks) • Part 2 • Build a software tool that can help improve a specific aspect of the information system for the Case Study organisation. (50 Marks) • Assignment Deadline • Monday, the 12th of May, 2008.

More Related