An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Input for a discussion on the LHC heavy-ion run (2010)update of the presentation to the 21-SEP-2010 LHCC referees’ meeting Massimo Lamanna CERN IT

  2. Checking the rates (RAW) • The following figures correspond to 100% duty cycle (LHC*Experiment) • One can then fold them with something of the order of the pp LHC duty cycle • All RAW are recorded to tape at CERN • ALICE • 12.5 MB/evt * 200 Hz (2,500 MB/s) • 200 TB/day • ATLAS • 2.2 MB/evt * 50-100 Hz (110-220 MB/s) • 10-20 TB/day • CMS • 12 MB/evt * 150 Hz (1,800 MB/s) • NB: large event size due to no zero suppression for HI 2010 • 150 TB/day • LHCb • No HI data taking

  3. Checking the rates (processing and export) • ALICE • No complete export/processing during the heavy-ion run • Export to completed in the weeks after HI (before 2011 pp) • During the HI run: • ~10-20% of the RAW rate (hence ~100MB/s) • ~10-20% RAW reconstruction (but NO ESD recording) • ATLAS • Complete RAW export to 1 sites (1 copy across ATLAS T1s) • Some processing: some ESD+DESD(+AOD) to tape and export • NB: (ESD+DESD)/RAW is ~ 6 (Very large ESD and DESD) • Assumption: at CERN express stream only – the rest is done at the Tier1s • Note: no ESD+DESD flux “back to CERN” (potentially very high) • CMS • No complete export during the heavy-ion run • Software zero-suppressed data will be shipped abroad after the run (1 site) • Full processing at CERN • RECO/RAW is 1/6 • RECO export to a few sites

  4. General considerations and constraints • These figures clearly exceed the foreseen data rates • CASTOR has some headroom (resilience, catch up, etc...) • Needed to achieved sustained and sustainable operations • “Background activities” like users analysis cannot be stopped • In addition we had ever no readiness test for combined HI operations • 4 experiments in pp mode and ALICE in heavy-ion mode alone • Strategy • Collecting these figures to prepare at best for heavy-ion operations • Trying to cope with the higher needs from the experiments • Get priorities among different activities

  5. Priorities and next steps • Priorities • Within each experiment • RAW to tape (data integrity) • RAW export (data integrity) • Processing (quality control and physics) • Export of processed data (physics and data quality control) • Interplay with “background activities” (pp analysis!, ...) • Across the experiments • Expect a statement from the referees • Iterate with the experiments • Use of 2011 resources to increase data rates • Uncharted area (scaling properties of the system depends on the actual workflows features (file sizes/rate, rate on CASTOR central services, …) • Combined test (ALICE+CMS) being scheduled • Priorities are needed to implement fallback plans • And collaboration from the experiments to control the load (user activity, reprocessing, …)