Hotbench Spacecraft PSS (Sim Data) MOC System XRT & UVOT FoM/IP/BAT. Initial PSU MOC Setup. Complete PSU MOC Setup. NFI. BAT. Functional Testing. FoM I/F Testing. ETUs. Day in the Life for IST. Day in the Life for Sim 2a. Acoustic Aliveness. Obs IST Dry Run #2. Obs IST
E N D
Hotbench Spacecraft PSS (Sim Data) MOC System XRT & UVOT FoM/IP/BAT Initial PSU MOC Setup Complete PSU MOC Setup NFI BAT Functional Testing FoM I/F Testing ETUs Day in the Life for IST Day in the Life for Sim 2a Acoustic Aliveness Obs IST Dry Run #2 Obs IST Base- line Sine Vibe Aliveness AIST EMI/EMC Aliveness TVAC Transitions: AIST Plateaus: IST Obs IST Dry Run TBalance TCycle TDRSS & Malindi ETE MRT#1 TDRSS SoH MRT#3 FSW Loads SCIF#3,4 Normal Ops Sim 2a (GSFC MOC) Normal Ops Sim 2c (People Sim) Normal Ops Sim 2b (window) L&EO Sim 1b FoM Activ L&EO Sim 1c Instr Activ (1d-Nov) L&EO Sim 1a S/C Bus Activ (GSFC MOC) Conting Sim 3a FSW Patch Safehold? Conting Sim 3b Conting Sim 3c Mission Ops Readiness Test Flow M. Chester, 9 May‘03