1 / 1

Mission Ops Readiness Test Flow

Hotbench Spacecraft PSS (Sim Data) MOC System XRT & UVOT FoM/IP/BAT. Initial PSU MOC Setup. Complete PSU MOC Setup. NFI. BAT. Functional Testing. FoM I/F Testing. ETUs. Day in the Life for IST. Day in the Life for Sim 2a. Acoustic Aliveness. Obs IST Dry Run #2. Obs IST

polly
Download Presentation

Mission Ops Readiness Test Flow

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hotbench Spacecraft PSS (Sim Data) MOC System XRT & UVOT FoM/IP/BAT Initial PSU MOC Setup Complete PSU MOC Setup NFI BAT Functional Testing FoM I/F Testing ETUs Day in the Life for IST Day in the Life for Sim 2a Acoustic Aliveness Obs IST Dry Run #2 Obs IST Base- line Sine Vibe Aliveness AIST EMI/EMC Aliveness TVAC Transitions: AIST Plateaus: IST Obs IST Dry Run TBalance TCycle TDRSS & Malindi ETE MRT#1 TDRSS SoH MRT#3 FSW Loads SCIF#3,4 Normal Ops Sim 2a (GSFC MOC) Normal Ops Sim 2c (People Sim) Normal Ops Sim 2b (window) L&EO Sim 1b FoM Activ L&EO Sim 1c Instr Activ (1d-Nov) L&EO Sim 1a S/C Bus Activ (GSFC MOC) Conting Sim 3a FSW Patch Safehold? Conting Sim 3b Conting Sim 3c Mission Ops Readiness Test Flow M. Chester, 9 May‘03

More Related