1 / 15

Booster Pump/ Compressor Procedures

Booster Pump/ Compressor Procedures. Rescue 31 Operator Instructions. Open fill station door. Put cylinder into receiving slot. Attach fill valve to bottle. Close bleeder valve. Open fill valve. Open bottle. Close fill station door completely, allowing locking slide to fully drop.

ponce
Download Presentation

Booster Pump/ Compressor Procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Booster Pump/ Compressor Procedures • Rescue 31 Operator Instructions

  2. Open fill station door

  3. Put cylinder into receiving slot

  4. Attach fill valve to bottle

  5. Close bleeder valve

  6. Open fill valve

  7. Open bottle

  8. Close fill station door completely, allowing locking slide to fully drop

  9. Open supply valve

  10. Increase regulator pressure to desired levelwarning! during shut down procedures, regulator pressure should be brought down to 0 psi to reduce pressure on internal spring and diaphram

  11. Open “booster valve” to gain more regulated pressure

  12. Open “fill valve”

  13. Allow bottle to be filled until booster has stopped creating pressure

  14. Shut down procedures • Close fill valve • Close booster valve • Decrease regulator pressure down to 0 psi • Close supply valve • Open fill station door • Close bottle • Close fill valve • Open bleeder • Replace fill valve into storage slot • Remove bottle • Close fill station door

  15. Filling more than one bottle • To fill more than one bottle more efficiently, you may skip shut down procedures and just open fill station door. This will automatically inhibit unit to function until another bottle is connected and fill station door is securely closed.

More Related