An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DOD LEED ImplementationNovember 12th, 2009 John Ambert, LEED AP Cass | Sowatsky | Chapman + Associates

  2. Cass | Sowatsky | Chapman + Associates • 350 Design build projects Nationwide • 58 Design build projects to achieve Certification • Dormitories, Barracks, BEQs, Airport Hangers, Educational + Training Facilities, HQ facilities, Mess Halls & Dining Facilities, Child Development Centers, Medical + Dental Clinics, Mail Handling Facilities, Residential Housing, Military Infrastructure • Staff : 27 • BIM technology + LEED APs

  3. John Ambert, LEED AP+ • Bachelors of Architecture, Cal Poly SLO • Minor: Sustainable Environments • Worked on 26 LEED projects • Certified – Platinum Level • Navy + Army Projects • USGBC + DOD Review Teams

  4. Presentation Overview • The Military and Sustainable Design • LEED Diction • Design Build Process • Key Aspects of LEED Program • Take Aways

  5. The Military & Sustainable DesignDOD Projects + Sustainability • Economic • Life Cycle Costs • Operating • Maintenance • Social • Improving the Quality of Indoor Environment • Environmental • Low Impact Development

  6. What does the Military Gain from Sustainable Design? • Energy Savings • 20-70% • Verified Performance • Lower Life-Cycle Costs • Reduced Compliance Burden • Waste + Pollution • Enhanced Productivity

  7. The Military & Sustainable DesignLEED Diction • LEED ≠ LEEDS • Leadership in Energy & Environmental Design • LEED AP • Building = Certified • People = Accredited

  8. The Military & Sustainable DesignLEED Diction • LEED Building = High Performance Building • Performance Based, Not Prescriptive • Based on Consensus Standards • ASHRAE, IES, ASTM, Inst. Of Transportation Engineers • Green Guard, Green Label Plus, Green Seal • LEED ≠ Building Code • Agenda pushing Market forward

  9. Design Build Process : Bidding + Proposal • Goal Setting Charrette : Starting the LEED Machine • Research + Analysis • LEED Project Goals • Analyze Project Impacts • Cost • Time • Feasibility • Flexible LEED Proposal • Provide Options

  10. Design Build Process : Kick Off Meeting w/ Government : Concept Design • User Requests • ROICC vs. RFP • Key Design Decisions • Orientation • Daylight • Ventilation • HVAC • Site • Strategies vs. Synergies • Singular Action with multiple benefits

  11. Design Build Process : Schematic Design • LEED “Champion” AP - Architect • Facilitates Integrative Design • Ongoing Iterative Cycle • Charrette / Research + Analysis / Documentation • Project Representative • Involved from Proposal to Post Occupancy • Information Source • Reference Guide • Coordinated Plan of Action • Design + Field Team • Quality Control • Submittals • LEED Letter Templates • Supporting Documentation

  12. Design Build Process : Schematic Design • Design Eco-charrette • Water Analysis • Energy Calculator • Daylighting • HVAC • Preliminary Material Selections • Strategize

  13. Design Build Process : Schematic Design • LEED Implementation Plan • All activities relating to LEED requirements • Design, Construction, Procurement, Submittals, Documentation • Outline Integrated Design Process • Timeline aligned with construction goals • Strategize

  14. Design Build Process : Schematic Design • Energy Modeler • Key Tool • “Eye in the Sky” • Coordinate all Trades • Breakdown Percentages & Ways to Improve • Limits GBCI Reviewer Questions • Incentive & Rebates • Savings by Design

  15. Design Build Process : Schematic Design • Question : What are the biggest costs in the building? • Energy Modeler will work with the design team throughout process • Multiple iterations • Modeling elements now vs later

  16. Design Build Process : Design Development • LEED Checklist • Project + Team Specific • Roles • Responsibilities • Timeline • Cost Impacts • Work in Progress • Re-Issued at critical points of Design & Construction • Build in Buffer • ~ 5% = 3-6 pts

  17. Design Build Process : Design Development • LEED Checklist • Verify & Validate Decisions made in Schematic Design • Finalize Material & Product Selections • Integrate LEED into Specs & Drawings • Commissioning

  18. Design Build Process : Design Development • RFP vs. End User • Design Team = Middle Man • Implement requests from Commander + ROICC • Base Specific Standards • B.E.A.P. • Desired, Possible, Feasible • RFP may define, but additional research is necessary to verify

  19. Design Build Process : Design Development • Commissioning (Design) • Owners Project Requirements (OPR) • Basis Of Design (BOD) • Commissioning Plan • Identify Systems, Team Responsibilities, Testing Procedures, Verification requirements • MEP / Solar / Geothermal • Specifications

  20. Design Build Process : Design Development : Specifications • Credits addressed in 3 approaches • General Conditions • Under Material & Product Sections • Direct notes on Drawings • Language • General Specs – Division 1 “ General Requirements” • Thresholds illustrated • Division Specific – Divisions 2-10 • Minimum Requirements defined • Performance + LEED Requirements • Specifics without selecting Material • Ex. Roofing : SRI = 29

  21. Design Build Process : Design Development : Specifications • Design Build = “ Outline Spec” • Must address issues in all sections • Create a tight set of specifications • Critical Point between Design Development and Construction Documents • Moving up or Down on the scale

  22. Design Build Process : Construction Documents • Cost Estimator • Fundamental to engage in process early • Life Cycle Costs • Understanding of LEED • Higher levels of Certification through integrated design • Positive + Negative Costs

  23. Design Build Process : Construction • Specifications • Analyze materials based on requirements • Select Manufacturers Submittal Requirements • Submittals • LEED Compliance Document • aka: LEED Contribution Statement

  24. Design Build Process : Construction • LEED AP (Construction Team) • On-Site • Instructor • Foreman / QC / Subcontractors • Representative • ROICC + Base • Manufacturer • Construction Team + Company

  25. Design Build Process : Construction • LEED AP (Construction Team) • Data Recipient • Synthesize LEED Data • Track & Report • LEED Documentation • Extract data from subs and enter into LEED Letter Templates • Update documentation throughout Construction Process • Work with Design Team LEED AP • Prepares Construction Package

  26. Design Build Process : Construction • LEED AP (Construction Team) • Trash Police • On-Site sort for Diverting Waste • Photographer • Time Lapse of Construction Process • Key SWWWP Indoor Air Quality items • Verifier • Materials selected are actually being implemented on site • Site Reports from Commissioning Agent • Gage • Tracking Performance throughout

  27. Design Build Process : Construction • LEED Notebook • Implementation Plan • LEED Checklists • LEED Timeline • Material Information • Cut Sheets • LEED Compliance Documents • Monthly Reports • Waste Tracking

  28. Design Build Process : Construction • LEED Notebook • Meeting Minutes • ROICC / Base Requests & Actions • Photographic Journal • Completed templates + supporting documentation

  29. Design Build Process : Construction • Commissioning (Construction) • Extra set of Eyes • Commissioning Plan • Involves Superintendant, PM + QC • Specification back check • Evaluates drawings + Installation • Generates Commissioning Report • Involves Owner + Construction Team to ensure proper actions are taken • Operations & Maintenance Manuals included in Submittals

  30. Design Build Process : Construction : Early Phases • Site Documentation + Opportunities • SWPPP Plan (CA) • Erosion Control • Identify Base Recycling Programs • Off Site haulers + Locations • IAQ Management Plan • SMACNA Guidelines • HVAC Protection + Housekeeping Plan • During Construction + Pre Occupancy • M&V Plan • Ongoing Accountability of Energy Consumption over time • Commissioning Plan

  31. Design Build Process : Construction : Early Phases • Educate field team • Design AP + Construction AP • New subs / QCs • Commander + ROICC • Incentives!! • Waste • Cleanliness • Strategize material selections • Top 5 : Block, Steel, Concrete, Gypsum • Gather supporting Documentation • LEED Worksheets

  32. Design Build Process : Construction : Nearing Completion • Update LEED Templates • Use to track process • IAQ Actions • Air Quality Testing vs. Two week Flush Out • Setting a Schedule for Deliverables • Commissioning Report • Innovation & Design Credits

  33. Design Build Process : LEED Submittal • Design Review • Documentation uploaded to LEED Online vs. Sent to LEED AP • Final coordination Meeting with Design Team • Identify Prerequisites! • AP to receive and distribute comments • Provide substantial documentation or credits may be denied

  34. Design Build Process : LEED Submittal • Construction Review • Design + Construction APs meet for group review • Clearly address prerequisites with care • Supporting Documentation • Cut Sheets + LEED Compliance Documents • Narratives • Written by Construction LEED AP + field team • Important to GBCI Review Teams • Innovation In Design = collaboration

  35. LEED & DOD projectsKey Aspects • Sustainable Sites • Parking – BEAP • Heat Island Effect – Roof vs. Non-Roof • Open Space • Stormwater Management

  36. LEED & DOD projectsKey Aspects • Water Efficiency • Landscaping – ATFP • Dual Plumbing – Future Use • Flush vs. Flow • Base Preferences • Maintenance

  37. LEED & DOD projectsKey Aspects • Energy & Atmosphere • Energy Model = Coordination between all trades • Tweaking HVAC system in the field for Optimal Performance • Measurement & Verification • Ensures efficiency + functionality

  38. LEED & DOD projectsKey Aspects • Materials + Resources • On-Site sort vs. Co-mingle • Recycled + Regional Materials • Strategize to ensure achievement • FSC Lumber • COC Certification • Camouflaged problem areas

  39. LEED & DOD projectsKey Aspects • Indoor Environmental Quality • Implement IAQ Plan early and revisit often • VOC Limits • Cheat sheet for distribution • Low Emitting Materials • Flat = 50g/L; Non-flat = 100g/L • Primer = 100 g/L (GS-11 2008) • NAUF wood

  40. LEED & DOD projectsKey Aspects • Innovation In Design • Exemplary Performance vs. Innovation • Waste Diversion • Water Efficiency • Teams should look to maximize all Credits • LEED Publishes a document of previously accepted ID Credits • Adaptability / Future Proofing • Be Creative

  41. Take Aways • Integrated Design Process • Tight collaboration within a Multidisciplinary Team • Whole Systems Thinking • Start Documentation Early • Educate and Encourage Field Team • Not a typical construction project

  42. Take Aways • Plan a buffer into the Checklist • 5% buffer (3-6 points) • Push for Certification over Validation • Improve Company Image + Portfolio • Stand by your Commitment to Sustainability • Post Completion Analysis

  43. Contact Info: John Ambert jambert@csc-a.com 619.298.3480