Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables)

Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables). Special Linac WG meeting: Assembly of the ISOLDE Cryomodules K. Artoos , A. Boucherie , P.F. Marillac , T. Renaglia, G. Villiger, K. Schirm , W . Venturini. OVERVIEW.

powa
Download Presentation

Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) Special Linac WG meeting: Assembly of the ISOLDE Cryomodules K. Artoos, A. Boucherie, P.F. Marillac, T. Renaglia, G. Villiger, K. Schirm, W. Venturini Mathieu Therasse BE/RF/SRF

  2. OVERVIEW • CONDITIONING OF PIECES FOR CLEANROOM • CAVITIES DELIVERY • COUPLER SYSTEM ASSEMBLY PROCEDURE • TUNER SYSTEM ASSEMBLY PROCEDURE • RF CABLES ASSEMBLY PROCEDURE Mathieu Therasse BE/RF/SRF

  3. CONDITIONING OF PIECES FOR CLEANROOM Baldaquin ISO5 in SM18 (for conditioning) Cleanroom assembly SM18 • Piece preparation • - All piece has to be degreased • Before entering in baldaquin clean it with alcohol and blow with N2 gas • The person inside has to blow it with N2 gas • Clean it again inside the Baldaquin (with cleanroom cloth with alcohol) • Put it in 2 plastic bag (Antistatic and used for clean room) with N2 gas and close it • Before entering in ISO7 • Remove the first plastic bag • Blow it with N2 gas • Give it to the person inside the cleanroom (who blows the bag from inside to outside with N2 gas) • Open the last plastic just before installation Rmk: The person outside has to manipulate all piece with gloves (without powder) Mathieu Therasse BE/RF/SRF

  4. CAVITIES DELIVERY • Cavity storage: • Beamport support (installed before the RF test) • Tuning plate and tuning plate collar (installed before the RF test) • Special support for the multifunction trolley (installed after the RF test) • Beamport, pick-up and coupler protections (under design) • 2 plastic bags (antistatic, PEBP) with N2 gas Cavities will be stored in SM18 in ISO5 Baldaquin on a support trolley. Cavities will be transported between the baldaquin and the cleanroom with a special trolley. Mathieu Therasse BE/RF/SRF

  5. COUPLER SYSTEM ASSEMBLY PROCEDURE RF coupler line Motor Control UHV rotary motion Rod RF power coupler Mathieu Therasse BE/RF/SRF

  6. UHV ROTARY MOTION FEEDTHROUGH INSTALLATION Preparation - Reception of the UHV rotary motion from MDC Vacuum - Drilling of the rotary axis on the vacuum part and of the extension rod - Leak detection of the UHV rotary motion - Connection of extension rod and UHV rotary in the ISO5 baldaquin - Conditioning in double plastic bags (PEBP) with N2 gas feedthrough Installation on the top plate (for top plate leak test) extension rod • Clean (dust cloth and alcohol) and check (no particle, scratch) top flange and UHV Rotary motion knifes • Put the CF 40 copper gasket • Fix the UHV rotary motion Mathieu Therasse BE/RF/SRF

  7. ROTARY AXIS INSTALLATION ON THE CRYOMODULE • Preparation • Axis reception (+ support ring) • Degreasing (102bldg or 867bldg) • Conditioning in Baldaquin ISO5 in SM18 (alcohol and 2 plastic bags with N2 gas) Procedure Screen Support ring Top view • Pass the axis through the passive thermal screen from the bottom, and plug it to the UHV rotary motion axis (Hexagonal head). • Fix the support ring in order to maintain the rod on the passive screen (2 half rings). • The rod is supported by the thermal screen Support ring Bottom view Mathieu Therasse BE/RF/SRF

  8. RF POWER COUPLER INSTALLATION • Preparation • Coupler reception (Cold tested in SM18 vertical Test stand) • Conditioning in baldaquin • Procedure • Put the antenna all out (in order to protect it) • Put the Hexagonal head of the coupler in the cylindrical piece of the axis • Give an angle to the axis in order to pass the coupler through the support • Screw it on the cavity • Put the antenna ALL IN Mathieu Therasse BE/RF/SRF

  9. COUPLER MOTOR CONTROL INSTALLATION • Preparation • Mount the motor control in the baldaquin ISO5 • Conditioning with 2 plastic bags with N2 gas Switch • Procedure • Put the handle on the motor • Put the motor on the TOP switch position (antenna ALL IN) • Fix it on the UHV rotary motion (tighten the bellow and 4 screws) • Put the antenna ALL OUT (by hand with the handle) • Adapt the position of the BOTTOM switch (antenna ALL OUT) if it is necessary • Put the antenna all in Bellow Mathieu Therasse BE/RF/SRF

  10. PICK-UP INSTALLATION • Preparation • Reception of the antenna, copper extension, RF connector • Degreasing of each piece at the chemistry • Clean each part with alcohol, blow with N2 gas and do the assembly in baldaquin ISO5 in SM18 • Conditioning with 2 plastic bags with N2 gas Installation on the cryomodule - Fix the antenna on the cavity Mathieu Therasse BE/RF/SRF

  11. TUNER SYSTEM ASSEMBLY PROCEDURE Tuner line Motor control Axis Lever arm Mathieu Therasse BE/RF/SRF

  12. TUNER MOTOR INSTALLATION • Preparation • Motor control reception • Conditioning with 2 plastic bags with N2 gas • Procedure (top plate leak test) • Check that the motor is on the BOTTOM END switch (corresponding to the tuner plate flat position) + 6mm (6 turns) • Clean the knife with a dust cloth and alcohol • Check particle or default on motor and top plate knifes • Put a CF 63 copper gasket • Fix the motor on the top plate flange and screw it Mathieu Therasse BE/RF/SRF

  13. TUNER AXIS INSTALLATION • Preparation • - Reception of the 2 axis parts, 2 link motion • Degreasing • Assembly of the axis in baldaquin ISO5 • Conditioning with 2 plastic bags with N2 gas • Procedure • - Pass the axis through the thermal screen from the bottom • - Connect the second part of the axis to the tuner control Mathieu Therasse BE/RF/SRF

  14. LEVER ARM INSTALLATION (I) • Preparation • Reception of lever arm mechanism • Degreasing in Bldg 102 • Mounting and conditioning in baldaquin in SM18 • Conditioning in 2 plastic bags with N2 gas • Procedure • Put the central screw on the tuning plate and block it with a nut. • Fix the tuning mechanism to the tuning plate collar. Screw the grey part. Mathieu Therasse BE/RF/SRF

  15. LEVER ARM INSTALLATION (II) Procedure - Adjust position of levers and clevis at the rod and in the centre - Fix the screws and the counter screws to connect the rod Mathieu Therasse BE/RF/SRF

  16. RF CABLES ASSEMBLY PROCEDURE • Preparation • Cable reception from Huber and Suhner with connectors (N type, 7/16”) • UHV RF connector receipt from Hositrad Ceramteccie, and Allectra • Leak detection on each connector • Cable testing (with Network analyser, attenuation…) • Conditioning cables and connectors with 2 plastic bags and N2 gas N type double sided on CF 40 flange (Allectra) 7/16” double sided on CF 63 flange (Ceramtec) • Procedure • Clean and check connectors and top plate flanges knifes (dust, scratch) • Pass the cable through the thermal screen and connect it to RF connector on the top plate • Fix the insulating tube on the passive screen • Connect cables to the pick-up and the RF power coupler Mathieu Therasse BE/RF/SRF

  17. Mathieu Therasse BE/RF/SRF

  18. Mathieu Therasse BE/RF/SRF

  19. Mathieu Therasse BE/RF/SRF

  20. Mathieu Therasse BE/RF/SRF

  21. Mathieu Therasse BE/RF/SRF

  22. Mathieu Therasse BE/RF/SRF

  23. Mathieu Therasse BE/RF/SRF

  24. Mathieu Therasse BE/RF/SRF