1 / 11

Advanced Product Quality Planning (A.P.Q.P.)

Advanced Product Quality Planning (A.P.Q.P.). Advanced Product Quality Planning & Control Plan (APQP) Second Edition July 2008. Product Quality Planning Cycle. Product Quality Planning Timing Chart. Why Revise APQP?).

prema
Download Presentation

Advanced Product Quality Planning (A.P.Q.P.)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Advanced Product Quality Planning(A.P.Q.P.) Advanced Product QualityPlanning & Control Plan (APQP)Second Edition July 2008

  2. Product Quality Planning Cycle

  3. Product Quality Planning Timing Chart

  4. Why Revise APQP?) • Only core tools manual that had not been updated since publication of ISO/TS 16949 • Limited revision to update the concepts and terminology - Compatibility with ISO/TS 16949 (1st Edition referenced QS-9000 - Current practices in Automotive industry

  5. What Has Not Changed • Basic structure and timing • Control Plan forms and methodology • Fundamentals of Quality Planning

  6. Summary of Changes in the APQP Reference Document • Clarification and Editorial • Consistent Terminology with ISO/TC 16949 and Focus on Customer • Update to Current Practices • General Review of Checklists and Forms • Removal of Customer Specific Info.

  7. Clarification and Editorial • Changes to the document to clarify concepts and terminology • Recognize changes in commonly used terminology in the industry • Improve flow and readability

  8. Consistent Terminology with TS and Focus on Customer Examples include: • Terms for “organization and supplier” • Alignment with PPAP - Significant Production Run • “Monitoring and Measuring” Devices • Voice of the Customer as focus element • Reference to Customer Specific Requirements for additional Guidance

  9. Update to Current Practices Emphasis and additional details on: • Effective use of Lessons Learned • Aligned with the Process Approach • Error Proofing/ Mistake Proofing • First time Quality • Drawings and Visual Standards • Measurement System Analysis • Pass-through Characteristics

  10. General Review of Checklist & Forms • Rephrased some questions to give clarity and remove ambiguity • Added a column for “N/A” since :yes/no” are not always appropriate • Question structure updated to reflect current practices • Addressed all requirements of PPAP

  11. Removed Customer Specific Information • Removal of the Dynamic Control Plan section (to be included in Customer Specifics) • Removed customer specific notation on special characteristics and replaced with references to Customer Specific Requirement documents

More Related