An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A “Deterministic” Approach to Reliability of Repairable Systems Paul Nelson (TAMU) & Shuwen “Eric” Wang (ABS Consulting)

  2. Background • DeVooght presentation in Atlanta • “… first reviewed … a unified summary of results on dynamic reliability that follow from the integral form of the Chapman–Kolmogorov (C–K) equation… he … closed with a very provocative comparison between dynamic reliability and neutron transport theory, suggesting that perhaps this could be a new area in which transport theorists might be able to make important contributions.” • but D solves the C-K equations by MC • can also do deterministically? • Mid 2000s interest in Risk-Informed Asset Management at NPPs

  3. Entry-time Process (Motivation) • Uses discrete algorithm to solve the Chapman-Kolmogorov (C-K) equations • Allows time-dependent transition rates • Can be used as a substitution where simulation is used • Definition of states is flexible, depending on need of particular applications

  4. Entry-time Process (Formal) • A marked point process {N(t),Zn}, where {N(t)}is a point process with no simultaneous arrivals • Mark Zn associated to arrival time Tn(more completely, to sojourn period [Tn, Tn +Sn+1]) • Rates of transition λij(τ,t) from state j to state i are specified as a function of calendar time t and entry time t

  5. How Does Entry-time Process Work? • Determine the time-dependant state probabilities • The generalized state-transition equations:

  6. A Pictorial Representation

  7. Finite-difference Methodology Any P(m,n) not along diagonal : Any P(n,n) along diagonal :

  8. Comparison to Simulation for a 3-state example State 1: In service; State 2: Out of service for PM; State 3: Out for corrective maintenance. Tr=3 years; Tpm=0.2 years; Tcm=0.4 years 10

  9. Comparison of Results 11

  10. Published Details • Nelson & Wang, Reliability Engineering and System Safety (2007), for details and further verification against simple models • Same authors, various conference papers, and Wang PhDdissertation (TAMU, Nucl. Engnrg., 2008) for verification against increasingly more realistic models. • Following application not (yet) published

  11. Toward a NPP Application A PM-Based scenario, for a NPP SSC for which time-dependent transition rate is important Failure rate (aging or infant mortality) Transition rates due to different PM Policies Failure data for the SSC must be available for a direct application of entry-time process An extraction methodology must exist that will permit the time-dependent transition rates to be obtained from the failure data no BNL or ENDF to the rescue 13

  12. Data—the Challenge • Time-dependent failure data are not easy to acquire from any single NPP • Need to find the “best fit” for the data to get time-dependent failure rates • INPO-EPIX database currently is the best database available for such applications

  13. Data Selection for Main Generators Option 1: Query failure records for all main generators manufactured by Westinghouse Option 2: Query all the failure records for main generators manufactured by Westinghouse that have model numbers similar to those of the STP generators Option 3: Query the failure records for main generator with STP model number only 16

  14. Data Interpretation Option 1: Interval Censored: Discovery by inspection procedure Option 2: No Censored Data (Exact failure): Discovery by alarm procedure 17

  15. States and Transitions(Main Generators) • Four States: • State 1 :In-Service • State 2: Out-of-Service for PM • State 3: Out-of-Service for Non-catastrophic failure • State 4: Out-of-Service for Catastrophic failure • Transition Relations:

  16. Annual Cost/Loss for each state

  17. NPV Cost and Survival Function for Different PM Policies

  18. Analysis of Results • The reliability performance of the main generator system tends to be better with a shorter maintenance period • The financial performance (NPV) tends to be better when the replacement period is close to 9 years • The $200M difference is about 10% of the net value of a typical existing NPP • Considering the requirement to minimize the NPV cost and still get a better reliability performance, replacement period of 9 years is preferred • There are no significant effects in decision making process when using Weibull distribution or lognormal distribution

  19. Thanks to Everybody!