Upper Snake Reservoir Operations April 11, 2014

Upper Snake Reservoir Operations April 11, 2014. Idaho Water Supply Committee Meeting. Water Year 2014 58% of Capacity. April 1st Coordinated Forecast 135% of average (4,370 kaf). Conclusions. April Coordinated Forecast 135% April projected operations No changes at Jackson Lake

Download Presentation

Upper Snake Reservoir Operations April 11, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Upper Snake Reservoir Operations April 11, 2014 Idaho Water Supply Committee Meeting

  2. Water Year 2014 58% of Capacity

  3. April 1st Coordinated Forecast 135% of average (4,370 kaf)

  4. Conclusions • April Coordinated Forecast 135% • April projected operations • No changes at Jackson Lake • Increasing discharge at Palisades to achieve required flood control space • American Falls will increase to meet irrigation demand • No water past Milner for month of April • In springtime weather drives reservoir operations • Temperature and precipitation • Irrigation demand • Runoff volume • Snowmelt timing