1 / 26

E D M PREPAYMENT SYSTEM

E D M PREPAYMENT SYSTEM. MOZAMBIQUE – GEOGRAPHIC LOCATION MISSION BACKGROUND OF COMMERCIALIZATION REORGANIZATION OF THE COMMERCIAL CYCLE PROCESS CONSTRAINTS INTRODUCTION OF PREPAYMENT SYSTEM - MOTIVATIONS IMPLEMENTATION FINANCING PREPAYMENT PROJECT REQUIREMENT

Download Presentation

E D M PREPAYMENT SYSTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E D M PREPAYMENT SYSTEM

  2. MOZAMBIQUE – GEOGRAPHIC LOCATION • MISSION • BACKGROUND OF COMMERCIALIZATION • REORGANIZATION OF THE COMMERCIAL CYCLE • PROCESS CONSTRAINTS • INTRODUCTION OF PREPAYMENT SYSTEM - MOTIVATIONS • IMPLEMENTATION • FINANCING • PREPAYMENT PROJECT REQUIREMENT • IMPLEMENTATION METHODOLOGY • SYSTEMS COMPARISON • RESULTS • CHALLENGES • CONTRAINTS • STRUCTURE AND NUMBER OF CUSTOMERS

  3. MOZAMBIQUE Area: 799 380 km2 Population: 18 Millions Capital: Maputo

  4. MISSION:The operation of the public service of Generation, Transmission, Distribution and Commercializationof electricity in Mozambique, in defence of the interests and to the benefit of the consumer.VISION:With Energy we build the Future

  5. Structure and Total Number of EDM Customers

  6. Background of Commercialization – Before 1995 • High Total Distribution Losses; • Bad debt losses; • Manual billing; • Billing/collection system; • No Commercial Procedures Manual; • Low productivity; • Low quality of service; • Huge customers complains; • high administrative costs.

  7. High Level of Losses - Comments • Frauds; • Bad collection ratio; • Technical losses due to the distribution grid quality; • Until 2003, some customers without meters; • Obsolete meters; • Manual Billing.

  8. Background of Commercialization – After 1995 • More concern about commercial activities; • Creation of the Commercial Department as a Central institution; • Implementation of the Loss reduction Projects: • -Restructuring of the Commercial activities; -Prepayment Projects. • Implementation of Marketing activities; • More readings and billing quality; • More concern about inspections and premises disconnections.

  9. Reorganization of the Commercial Cycle (Post Paid System) • Readings; • Billing; • Invoices Distribution; • Collection; • Inspections; • Disconnections; • Reconnections.

  10. Process Constraints • Quality of readings; • Quality of billing / number of complained Bills; • Hard to locate customers premises; • Hard to achieve a good collection Ratio; • Debt recover difficulties; • High management cost; • Non effective for demand side management.

  11. INTRODUCTION OF PREPAYMENT SYSTEM - Motivations • High Total Distribution Losses (about 43% in 1995); • Bad debt (from domestic and public institutions); • Bad readings • Low quality of service; • High running costs associated to the customers management; • Low income Customers.

  12. Implementation • Pilot Project in 1995, for 500 customers in Matola city; • A similar project was carried out in Maputo city, for 5.000 customers, in 1996; • The huge number of meters have been installed since 2002, in extent of the B.O.T projects; • Other projects;

  13. Financing • The Company adopted the following financing schemes: • Turn key Projects; • Projects financed by own funds; • Projects financed by commercial credits and others (grid expansion credits). Implementation Criteria • Difficult access installations; • Low purchasing power customers; • Seasonal customers.

  14. Requirements of a Prepayment Project • IT: • Sales and management system (Software); • System Master Station (SMS Hardware); • Posts of sale; • GIS/GPS System;

  15. Equipment and Services • Aerial photograph; • Prepayment meters; • Ready Boards; • Communications; • Private vending posts; • Training; • Customers information and advertisement; • Revision of the commercial procedures; • Management.

  16. Implementation Methodology • Geographical definition of the implementation area; • Establishment of the Post of Sales sites; • Area Mapping; • Staff training; • Installation of the hardware and the vending system; • Installation of the hardware and GIS/GP; • Customers information and advertisement; • Meters installation; • Storage of the meter geographic information.

  17. SYSTEMS COMPARISON

  18. COLLECTION AND SALES COMPARISON

  19. CUSTOMER QUALITY SERVICE COMPARISON

  20. Results • The total distribution losses decreased from 43%, in 1995 to 18%, in 2005.

  21. Number of Customers Dez/2005

  22. Results • The number of customers increased to 130.000, in 2005; • The quality of service improved; • The company cash in flow increased; • The collection Ration improved from 75%, in 1995, to 94%, in 2005; • Ease to recover debt through the system.

  23. Challenges • To cover all domestic customers with prepayment system (this is also EDM Police); • installation of spit meters; • To reduce the fraud customers premises vulnerability; • Implementation of AMR in Beira City to monitor the losses; • AMR to cover Maputo and Matola, for the same purpose.

  24. Constraints • Huge initial investment (management system and meters); • Meters´ life expectation short; • High replacement meters cost.