An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What is Go SOLAR Broward Rooftop Solar Challenge? • U.S. Department of Energy Grant • Broward County and 14 partner cities collaborating to make solar rooftop system installation easier, faster and cheaper for residents and businesses

  2. Grant Objective • To make solar energy more accessible and affordable to the public • To make the process of going solar simpler, faster and more cost effective for residents and small business owners

  3. Committees • Outreach – develop and implement a community-wide education and outreach campaign to raise awareness of the benefits of renewable energy and promote the installation of rooftop PV systems among residents and small business • Financing – Investigate potential financing options for the installation of rooftop PV systems in residential and small commercial structures • Planning and Zoning – Identify restrictive zoning ordinances and develop best practices for more favorable zoning provisions • Standardized Permitting – create a streamlined solar permitting process for all participating agencies and departments throughout Broward County.

  4. Standardized Permitting • According to DOE, permitting can be as much as 20% of the total cost of PV solar installation • A streamlined permitting process enables solar companies to more efficiently manage their labor, materials, and cash flow resulting in significant cost reductions and lower prices for consumers • An on-line permitting system for PV solar installations: • Saves Time: Apply online 24/7 • Saves Money: Select pre-approved engineered design plans • Provides a standard permit fee: Everyone pays one standard fee online • Is hassle free: Obtain a permit electronically in minutes

  5. Online Permitting System • Estimated launch date: End of October • Permitting system to be used by solar contractors applying for solar PV rooftop installation systems • Permitting system to be used by partner cities to process and track permit and inspections • Permit is issued at the end of application process • Inspections can be requested online once permit is issued

  6. Welcome Page

  7. Registration

  8. New Permit

  9. Terms of Use

  10. Property Information

  11. Property Owner Information

  12. Project Information

  13. Roof Structure Type

  14. Pre-approved System & Plans

  15. Permit Application Summary

  16. Permit Application Summary

  17. Application Payment

  18. Payment Confirmation

  19. View & Print Documents

  20. Review Permit

  21. Permit Detail

  22. Permit Detail

  23. Permit Document

  24. Next Step: Request Inspection From the permit detail page:

  25. Permit Inspection

  26. Permit Inspection Requested

  27. What happens next? After a permit is issued: • Applicant completes and submits an “Application for Interconnection” under FPL’s their Net Metering Program • Applicant requests all inspections using the online permitting system • The city’s Building Department receives notification that a permit was issued Once all requested inspections are completed: • Applicant follows up with FPL for interconnection • E-mail notification is sent to FPL and the appropriate fire marshal

  28. Permitting SystemQuestions?

  29. Go SOLAR Online Permitting System Tentative Training Schedule • Tuesday, October 16th for building officials and partner cities staff • Wednesday, October 31st for Applicants (solar contractors)

  30. Contact Information Maribel Feliciano, Permitting Committee Team Leader mfeliciano@broward.org Email: gosolar@broward.org Website: www.broward.org/gogreen/gosolar Facebook & YouTube @ Broward Environment Twitter @ BrowardEnv