Cables: Table. Calorimeter Data Readout Calorimeter L0 Trigger Calorimeter LVPS 380 VDC Calorimeter LVPS monitoring and control Calorimeter HCAL 100 VDC Calorimeter HCAL 30 VDC Calorimeter ECAL 100 VDC Calorimeter ECAL 30 VDC Calorimeter PS/SPD 100 VDC Calorimeter PS/SPD 18 VDC
E N D
Cables: Table • Calorimeter Data Readout • Calorimeter L0 Trigger • Calorimeter LVPS 380 VDC • Calorimeter LVPS monitoring and control • Calorimeter HCAL 100 VDC • Calorimeter HCAL 30 VDC • Calorimeter ECAL 100 VDC • Calorimeter ECAL 30 VDC • Calorimeter PS/SPD 100 VDC • Calorimeter PS/SPD 18 VDC • Calorimeter TFC link TTC fiber cable • Calorimeter ECS CAN • Calorimeter ECS SPECS • Calorimeter Monitoring source SPECS • Calorimeter Monitoring Source CAN • Calorimeter Monitoring Source Control signal Robert and Andreas For each of these: Barrack to Patch panel, patch panel to virtual fixed point, fixed point to electronics platform
Cables: Vincent’s Questions. Long cables: • When are which cables needed? • Any non-standard connectors? Supply by April. • DSS: (organised by Rolf). What equipment is needed? Cables will be supplied. • Clear drawing, pinning info and connectors needed. Sub-detector to patch panel: (Manpower supplied by CERN). • Who is supervising it? • Cables and connectors supplied by SD. Internal cabling of TELL1 crates. • Optical patch panel to TELL1 SD responsibility. • When are TELL1 crates delivered? (No delivery date so far).