1 / 1

INSTALLATION ON ‘89-’98 CUMMINS 5.9L 12V

Discover the step-by-step guide for installing upgrades or modifications on '89-'98 Cummins 5.9L 12V engines. Learn the essential installation process and tips for optimizing performance in your Cummins-powered vehicle.

Download Presentation

INSTALLATION ON ‘89-’98 CUMMINS 5.9L 12V

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PAGE 2: INSTALLATION ON ‘89-’98 CUMMINS 5.9L 12V - PART #TTC899812VHS08 In order to bring our 12pt nut and washer combination down to the same installed height as the factory head bolt, modification of the rocker arm pedestal (illustration A) is needed. Also included in this kit are the secondary 8mm rocker arm pedestal (hold down) bolts which were previously unavailable. Stud Top A. B. .200” Deep 1.100” 6.615” - 6.665” Deck Top 1-800-489-6820 | info@TrackTechFasteners.com | 4747 Central Way, Fairfield, Ca., 94534

More Related