University of South AlabamaMobile, AlabamaFRR Team Members Tim Morgan Alex Scruggs David Shaw Andy Mosley Joseph McCreary Nick Hall
Launch Vehicle General Dimensions • Length = 118.3 “ • Diameter = 4” • Mass = 13.5 oz.
Launch Vehicle Components • Nose Cone • Plastic • 3.9 “ Diameter • 16.75 “ Long
Launch Vehicle Components • Body Tube • Phenolic Tube • 4 “ Diameter • 101.64 “ Long
Launch Vehicle Components • Stabilizer Fins • G-10 Fiberglass • Thickness: .098 “ • Root: 6” • Span: 6” • Sweep: 1.5” • Tip Cord: 3”
Launch Vehicle Components • Motor Mount and Retention • AeroPack • AeroPack Retention
Launch Vehicle Components • Motor • AeroTech • K270W • Max Thrust : 695 N • Avg. Thrust : 466 N
Simulated Flight Results • Max Velocity : 743.04 ft/s • Max. Acceleration: 390.76 ft/s^2 • Max Altitude: 5448ft • Rail Velocity: approx. 47.25 ft/s • Range Drift: 17 ft (calm)
Stability • CP from nose: 89.99” • CG from nose: 99.87” • Stability Margin: 2.47 • Thrust to Weight Ratio: 14.29/1
Vehicle Safety and Verification • Insured that all components are properly attached in their appropriate locations • Created pre-launch checklists to verify all components function properly • Tested scale rocket to ensure that all interrelated components function suitably • Test were conducted on January 9th
Recovery • Dual Deployment • Redundant Perfect Flight 15k Altimeters, 9V Power Supplies and Black Powder Deployment Charges
Recovery • Main Chute • 72 “ Conical with 14” spill hole • Decent Rate: approx. 20 ft/s • Deployment Altitude: 700 ft. • Drogue Chute • 18 “ Conical with 2.5” spill hole • Decent Rate: approx. 82 ft/s • Deployment Altitude: 5277 ft
Recovery System Safety Verification and Testing • Conducted test to ensure that the proper amount of black powder will be used • Conducted bench test to ensure the proper function of flight computers • Field Tested Perfect Flight Altimeters • Tests were conducted between December 7th through January 9th
Humidity/Temperature Probe Testing • Calibration Equations • Recorded Ambient Conditions and Probe Voltage Output Simultaneously • Applied Water Vapor to a Glass Vessel to simulate high humidity environments • Applied heat to the Glass Vessel to simulate high temperature environments
Full Scale Flight Test • Full Scale Rocket • Launched on AeroTech K700 • Altitude: 6257’ • Full Scale Scale Payload
Dual Deployment Avionics Test • Flight Tests Completed January 9th • Perfect Flight 15k Altimeter • Drogue deployed at 6044’ main at 400’
Ejection Charge Amount Test • Off Campus Test • Different Packing Methods Tried • Different Amounts of Black Powder Tried • Different Powder Types Tried • 3.5 grains of FFFF in a compressed cardboard tube is the best
Payload Purpose: Collect Pressure, Temperature and Humidity Data Implementation: Use G-Whiz HCX Flight Computer to record data from Vaisala HMP 50 Temperature/Humidity Probe
Payload InstrumentationVaisala HMP 50 Humidity and Temperature Probe Cable colors. 1. Brown +VDC 7 to 28 VDC 2. White +0…. 1/2.5/5 V 0 to 100 % 3. Blue -VDC 4. Black 0... 1/2.5/5 V -40 to +60 °C • Accurate • 0-5 V Linear Output
Payload InstrumentationG-Whiz HCX Flight Computer P/N 09140 • Barometric and Acceleration based altitude measuring • External Analog Data Storage (0-5 V) • Sample Rates up to 500 times per second
Integration Feasibility • Created to be Interchangeable • Integration is simple • Can be installed into rocket in 30 seconds
Payload Safety and Verification • Pack and Seal Payload Components Safely for Travel to Launch • Test All Onboard Batteries, Replace if Necessary • Check Ventilation Holes for Proper Air Flow • Test All Instrumentation and Onboard Computers Prelaunch • Determine That All Payload Wires are Connected Properly • Proper Packing and Placement of Parachutes • Ensure Chute Cords are Attached Properly and Securely • Payload Testing and Calibration Shall be Conducted Weekly from Dec 14-Jan4