70 likes | 219 Views
BIM-MEP AUS Pump Industry Australia. The PIA represents pump manufacturers and distributors across all pump industries across Australia AMCA approached the PIA to create a sub committee of different pump manufacturers to collaborate with, contractors, consultants and software providers. .
E N D
BIM-MEPAUS Pump Industry Australia • The PIA represents pump manufacturers and distributors across all pump industries across Australia • AMCA approached the PIA to create a sub committee of different pump manufacturers to collaborate with, contractors, consultants and software providers.
BIM-MEPAUS Manufacturer Involvement • Pump Manufacturers one of the first workgroups established to develop workflow and content. • Benefits to consultants and contractors. • What are the benefits for supplier involvement • Costs incurred by suppliers versus value generated to our customers. • Content development & hosting supply agreements
BIM-MEPAUS Model Content Development • End suction back pull out spacer coupled ISO2858 & DIN EN733 pumps • Generic dimensions between all manufacturers • Basic pump used in Australia traditionally for last 25 years • Defined range of pump volute sizes approximately 50 models per range • With motor variants included this brings each range to 400 variants. • Limited generic BIM models required to cover range of manufacturers • Ideal 1st product for proving content development and creation of workflow processes.
BIM-MEPAUS Model Content Development • Agreement on required model attributes:- • Fixed dimensions • Manufacturer variable dimensions • Level of model detail – electrical, ventilation, service access etc • Industry best practice input from consultants, contractors & manufacturers for creation of BIM pump equipment schedule with fields for:- • Design schedule • Performance schedule • Installed pump data • Commissioning schedule • Complete life traceability of the pump procurement program attached to the building documentation.
BIM-MEPAUS Managed Content Proposal (WIP) Preliminary content development and hosting proposals created, currently under review. Identification and communication to generate understanding of BIM models for other pump ranges / cost of creation, modification and hosting for the complete range across all building pumped applications.