Data Center Decommissioning Case Studies at Moderne Glass

Quantum Technology was hired to remove an out of use data center (complete cleanout, floor to ceiling contents). The scope included the removal of the 2 generators that were supporting the facility. https://quantumtechnology.net/project/moderne-glass-2/

Download Presentation

Data Center Decommissioning Case Studies at Moderne Glass

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Center Decommissioning Case Studies at Moderne Glass KEY FACTS Location:PA Type:Data Center Decommissioning Scope:Entire facility including 2 generators Duration:3 weeks Client:Tom McKnight Quantum Technology was hired to remove an out of use data center (complete cleanout, floor to ceiling contents). The scope included the removal of the 2 generators that were supporting the facility. Experience seamless transitions with thedata center decommissioning solutions

More Related