VSP Vision Care

VSP Vision Care. HQ1, AT A GLANCE: 152,000 SF 9,700SF Data Center Fully automated Rancho Cordova, CA Constructed in 1992 Began certification effort in 2007 Internal Team – 5 people External Team – FEA and Commissioning Agent. Energy Saving.

quasar
Download Presentation

VSP Vision Care

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VSP Vision Care • HQ1, AT A GLANCE: • 152,000 SF • 9,700SF Data Center • Fully automated • Rancho Cordova, CA • Constructed in 1992 • Began certification effort in 2007 • Internal Team – 5 people • External Team – • FEA and Commissioning Agent

  2. Energy Saving • Started with an Energy Star rating of 29! • Implemented: • Optimized lighting and HVAC controls • Sub-metered electricity • Scheduled Janitorial daytime cleaning • Developed training for employees • IMPLEMENTATION RESULTS………. • $ 123,254 Implementation Costs • $ 64,030Annual Savings • 14% Annual Energy Savings • 2 years Payback • Energy Star rating of 93! Received ENERGY STAR Label in 2009

  3. Waste Reduction • Initial Diversion Rate of 40% • Implemented: • Performed Waste Audit (Baseline) • Increased Number of Recycling Bins • Improved Staff Education • Reduced Size of General Waste • Sustainable Purchasing • IMPLEMENTATION RESULTS……… • $ 42,828 Implementation Costs • $ 21,888Annual Savings • 14% Annual Energy Savings • 2 years Payback Achieved 82% Waste Diversion (September 2008)

  4. Water Projects - Savings Beyond Energy • Implemented: • Installed of low flow plumbing fixtures • Installed of aerators on faucets and dual flush valves on water closets • Installed Light-Powered touch-free faucets • Installed Sub-meters on process systems (café’ and cooling tower) • Replaced irrigation water use by: • Replacing scrubs with decomposed granite • Replacing spray irrigation with bubbles • Replacing existing plants with more water efficient plantings • IMPLEMENTATION RESULTS………. • $ 39,597 Implementation Costs • $ 5,111Annual Savings • 50% Annual Water Savings • 7.5 years Payback

  5. Indoor Environmental Quality • Implemented: • Meet ASHREA 62.1-2004 Standard • Relocated Smoking Shelter • Installed CO2 and Humidity Sensors • Installed MVR13 Filters • IMPLEMENTATION RESULTS………. • $ 82,546 Implementation Costs

  6. LEED by the Numbers The difference is $ 425,845.

  7. Innovation – Raising the Bar Exemplary Performance • Recycling 82% - September 2008 • Water Efficiency 36% below the water use Baseline Innovative Operation • Chemical-free cooling water treatment. • Solar battery recharging station – decreased the amount of battery purchased as well as the recycling cost

  8. VSP Vision Care ACHIEVED PLATINUM CERTIFICATION UNDER LEED – EB VERSION 2.0 - AUGUST 2008 Sustainable Sites 7 points Water Efficiency 3 points Energy & Atmosphere 20 points Materials & Resources 16 points Indoor Environmental Quality 14 points Innovation 5 points Total 65 points Certified 32-39, Silver 40-47, Gold 48-63, Platinum 64-85

  9. Achievements: VSP • Over 2,200 VSP team hours • VSP hours + 600 FEA hours = 2,200 team hours • Achieved Platinum – August 2008 • Achieving Operational Excellence • 14% annual energy savings • 50% annual water savings • 82% high, waste recycled (Sept ’08) • Received 5% reduction on insurance premium