KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS

KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS. Nexus Energytech Pvt. Ltd. Arvind Karandikar 9011061710 arvind@nexusenergy.in. Types of Challenges. Stakeholders in rooftop grid connect projects. Development challenges. Awareness of all stakeholders

quasim
Download Presentation

KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar 9011061710 arvind@nexusenergy.in

  2. Types of Challenges

  3. Stakeholders in rooftop grid connect projects

  4. Development challenges • Awareness of all stakeholders • Utility worry about losing well-paying customers • Uncertain policies and changing scenario • Process and documentation for project development in various models • Financial closure – project financing • Identification of roof owners • Identification of suppliers, EPC, O&M

  5. Management challenges – 25 years?? • Grid availability and quality – LV level • Financial strength of utilities or private clients • Payment security mechanism • Changes to roofs, locations – own and neighbors • Service manpower and spares • Re-validation of different agreements • Changes in consumer loads in net metering • Emergency backup supply for buildings

  6. Technology challenges • Grid tied inverters – certifications and standards • Roof fixing techniques and availability • Protection features • Regular calibration of various equipment • Timely replacement of components • Recycling methods and setups for material

  7. Few Specifics – Net Metering • Regulations are yet in draft stage • Each SERC has to have own regulation for the state – requires time • Currently net metering attractive only for high tariff consumers – needs additional incentives • State-wise different connectivity specifications • Low voltage grid strengthening necessary at many places

  8. Few Specifics – Gross metering • Utilities unwilling / unable to provide FIT due to possibility of further reducing costs of solar energy • Private customers (for third party sale) unwilling to have long term PPA • Charges of transmission, wheeling, distribution and CSS are high, making solar energy more expensive

  9. Way forward …

  10. More actions …

  11. Thank you ….. Arvind Karandikar arvind@nexusenergy.in