An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Utility Corridor and Roadway Relocation ProjectProject Start January 2013Anticipated Completion June 2015 Soil Management • Screening of all soil to be re-used or disposed of • Re-use or disposal of excess soil

  2. Utility Corridor and Roadway Relocation Project Re-use of Excess Soil • Excess soil estimate = 195,000 tons • Current cost to re-use = $0 • Current cost to dispose offsite = $100 per ton • Cost avoidance potential = $19.5 million Additional Benefits of Re-use • Re-use of landfill materials at the source • Site elevation increases to address storm surge concerns • Avoidance of 6,800 truck trips needed to dispose 195,000 tons of excess soil will reduce vehicle emissions and on-campus traffic related to "to and from" truck trips

  3. Utility Corridor and Roadway Relocation Project On-Campus Options for Re-use of Excess Soil • Parking Lots • North Parking Lot • Lot D • South Parking Lot • Roadway Areas • Bianculli Boulevard adjacent to Boston College High School • Landscaped Areas/Landforms • Commencement Lawn • Soccer Field and Track • Behind Calf Pasture Pumping Station • Between Calf Pasture Pumping Station and Lot A (Quonset Huts) Site elevations to be determined by: • Adjacent existing or proposed (e.g. Campus Quadrangle) elevations • Storm surge concerns • Views

  4. Utility Corridor and Roadway Relocation Project Screening • Visual screening to identify type of soil based on composition so that it can be temporarily stored and managed appropriately • Physical screening of soil that is filled with debris – glass, brick, metal, boulders – these materials represent risks of future settlement On-Campus Location Options for Physical Screening and/or Temporary Storage • South Lot • Lot A • Lot B • Lot C • Lot D