210 likes | 351 Views
Airfield Snow Removal Tactics. Runway Condition?. The Snow Plan. Snow Plan Design. Create a specific plan of action, well before the season arrives Establish airfield priorities and runway maintenance times
E N D
Snow Plan Design • Create a specific plan of action, well before the season arrives • Establish airfield priorities and runway maintenance times • Snow removal operations should be both interactive and systematic, involving a collaborative effort on behalf of multiple agencies
Team Effort • Airport operations designs the snow plan to achieve specific goals during a snow event • Include the FAA (tower) to understand it’s role in snow removal. • Include the airlines to support a proactive snow plan • Include airfield maintenance to execute the plan
Hydrostatic Brooms • Produced better friction results • Restricted capability in heavy snow accumulations
MTE Advantages • Plow, sweep and air blast the surface in one pass • High performance capability reduces runway occupancy times (30mph plus) • One person operation promotes effective utilization of human resources • The MTE operates effectively in snow accumulations from 0 to 30 inches
Runway Deployment Runway 08/26 10,000ft long X 150ft wide Complete in 10 Minutes Yellow Runway Team Green Taxiway Team
Runway Team12,000 x 200ft 4R 22L MANAGERS EQUIPMENT 11 Multi Tasking Equipment Lead Plow 2 High speed high capacity snow Blowers 2 4000 Gallon Chemical Tankers/90’ Spray Boom 1 Friction Measuring Vehicle 16 Total pieces of equipment 1 Operations Field Manager 1 Airport Maintenance Supervisor
Taxiway Team EQUIPMENT 4 Multi Tasking equipment Lead plow 1 4000 Gallon Chemical Tankers/50’ Spray Boom 1 Blower 6 Total equipment
Tactical Equipment Program 16 Runway team 6 Taxiway team 22 total number of equipment
Training and Safety • Establish a training and safety position or department • Develop consistent training procedures including pre and post operator equipment inspections • Recurring training for airfield operators is required • Establish operator accountability
Are You Ready? Thank You