1 / 21

Airfield Snow Removal Tactics

Airfield Snow Removal Tactics. Runway Condition?. The Snow Plan. Snow Plan Design. Create a specific plan of action, well before the season arrives Establish airfield priorities and runway maintenance times

Download Presentation

Airfield Snow Removal Tactics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Airfield Snow Removal Tactics

  2. Runway Condition?

  3. The Snow Plan

  4. Snow Plan Design • Create a specific plan of action, well before the season arrives • Establish airfield priorities and runway maintenance times • Snow removal operations should be both interactive and systematic, involving a collaborative effort on behalf of multiple agencies

  5. Team Effort • Airport operations designs the snow plan to achieve specific goals during a snow event • Include the FAA (tower) to understand it’s role in snow removal. • Include the airlines to support a proactive snow plan • Include airfield maintenance to execute the plan

  6. The Equipment

  7. Hydrostatic Brooms • Produced better friction results • Restricted capability in heavy snow accumulations

  8. Plow Truck and Broom Truck

  9. Multi-Tasking Equipment (MTE)

  10. MTE Advantages • Plow, sweep and air blast the surface in one pass • High performance capability reduces runway occupancy times (30mph plus) • One person operation promotes effective utilization of human resources • The MTE operates effectively in snow accumulations from 0 to 30 inches

  11. Snow Blowers

  12. Runway Team Configurations

  13. Runway Deployment Runway 08/26 10,000ft long X 150ft wide Complete in 10 Minutes Yellow Runway Team Green Taxiway Team

  14. Runway Team12,000 x 200ft 4R 22L MANAGERS EQUIPMENT 11 Multi Tasking Equipment Lead Plow 2 High speed high capacity snow Blowers 2 4000 Gallon Chemical Tankers/90’ Spray Boom 1 Friction Measuring Vehicle 16 Total pieces of equipment 1 Operations Field Manager 1 Airport Maintenance Supervisor

  15. Taxiway Team EQUIPMENT 4 Multi Tasking equipment Lead plow 1 4000 Gallon Chemical Tankers/50’ Spray Boom 1 Blower 6 Total equipment

  16. Tactical Equipment Program 16 Runway team 6 Taxiway team 22 total number of equipment

  17. Edge Light Plow

  18. Multi Seasonal Equipment

  19. Training and Safety • Establish a training and safety position or department • Develop consistent training procedures including pre and post operator equipment inspections • Recurring training for airfield operators is required • Establish operator accountability

  20. Are You Ready? Thank You

More Related