Kendall Area Supply. Presentation to NEPOOL Reliability Committee July 22, 2004. Kendall Area Load At Risk. Based on projected 2005 peak load conditions for Cambridge the following constraints exist:
E N D
Kendall Area Supply Presentation to NEPOOL Reliability Committee July 22, 2004
Kendall Area Load At Risk • Based on projected 2005 peak load conditions for Cambridge the following constraints exist: • All lines in conditions require at least 25 MW of generation to be running calling for two steam units to be dispatched • N-1 conditions call for either dispatching a Jet or closing Mirant’s T43 115 kV tie • N-1 + Generator out calls for both dispatching a Jet and closing Mirant’s T43 115 kV tie (see diagram) • Conclusion is that two steam generating units as well as one jet generator are needed for system reliability until the new East Cambridge substation is in service
Cambridge Supply Concerns w/ Somerville Xfm Out and Loss of One Steam Unit