Kendall Area Supply

Kendall Area Supply. Presentation to NEPOOL Reliability Committee July 22, 2004. Kendall Area Load At Risk. Based on projected 2005 peak load conditions for Cambridge the following constraints exist:

Download Presentation

Kendall Area Supply

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kendall Area Supply Presentation to NEPOOL Reliability Committee July 22, 2004

  2. Kendall Area Load At Risk • Based on projected 2005 peak load conditions for Cambridge the following constraints exist: • All lines in conditions require at least 25 MW of generation to be running calling for two steam units to be dispatched • N-1 conditions call for either dispatching a Jet or closing Mirant’s T43 115 kV tie • N-1 + Generator out calls for both dispatching a Jet and closing Mirant’s T43 115 kV tie (see diagram) • Conclusion is that two steam generating units as well as one jet generator are needed for system reliability until the new East Cambridge substation is in service

  3. Cambridge Supply Concerns w/ Somerville Xfm Out and Loss of One Steam Unit