650 likes | 836 Views
Introduction on MP2. 2009/05/21. Material control system Package Ver. 2.0. SN Corporation (HK) Limited. http://members3.jcom.home.ne.jp/wt.koga/. Preface. MP2 is a commercialized product designed for mid-range manufacturing company whose core business is on Assembly/Parts Fabrication.
E N D
Introduction on MP2 2009/05/21 Material control system Package Ver. 2.0 SN Corporation (HK) Limited http://members3.jcom.home.ne.jp/wt.koga/
Preface MP2 is a commercialized product designed for mid-range manufacturing company whose core business is on Assembly/Parts Fabrication. (This system is designed and developed by Japanese developer and is particularly targeting for those active Japanese corporation in overseas) MP2 (Materials control system Package Ver.2.0) is a real resource management system that the concept is based on MRP technique and down-sizing is pursued for using the ease operation on MS-Windows and high-reliability of data-base. Upon installing of this system, timely delivery/purchasing, accurate stock management, stock reduction and stock shortage minimizing can be achieved.
Feature ->Material ordering fit into production format Schedule (Forecast) Production : Calculate required quantity according to production schedule Product-by-order : Calculate required quantity according to production order Material C (low cost) : Purchasing made by Order Point and Order Size (OP/OS) 計画
Feature -> Using real data-base technology The ADO proposing by Microsoft is using on data-base access. (ADO : ActiveX Data Objects) Table name of database/field names are in English. Database structure is open to user. The database can be connected… Microsoft SQL Server (recommend) Microsoft Access (recommend for stand-alone) Oracle DB2 Making changes in the “setup” file allows different DB connection
Feature -> Matching factory-scale hardware structure Number of client deployment can be selected at user’s will. (Minimum : stand-alone)
Feature -> Data entry through bar-code voucher Data input/checking through small-size terminal Data input through bar-code voucher PO/DN, stock-taking form
Feature -> Release stimulation • Master the parts-shortage before creating the stock-out data • (day unit, stock quantity in 30-days advance) • - Entry of delivery forecast by vendor
Feature -> User customizable report tools • Crystal Reports 9 have been used on report development that allows user modification. • Since, ordering data is sending through electronic mail which a mini-EDI environment becomes possible. • Graphic display • Auto electronic mail sending function. Applicable to purchasing. • Rich selection on management report ranging from day to month unit.
Feature -> Bi-lingual support Japanese, English, (Chinese, Thai) Multi-currency support
The places where the system have been successfully installed Already deployed within Japan : 3 installations Overseas : 4installations (including version upgrade)
MP2 Menu Jump to Master
Order Release -> Order Release / Assembly Order Result Entry
Order Release -> Print Order Sheets / Print Ex-Warehouse List
Warehouse -> Extra Or. Warehouse Entry / Extra Or. Ex-Warehouse Entry
Stock Taking -> Generate Stock Data / Print Stock Taking Slips