SPARTA SPecial Asset Real-time Tracking Aid Design Engineers: Sponsored by: Kevin Priest and Cubic Corporation Submitted to J. Kennedy and L. Tummala Design Co. Ltd, San Diego, CA Matthew Den Herder Jason Fullen Daniel Martinez James Sparks Kellyne Winchester • Gustavo Barrios • Adrian Cedeno • Eduardo Ceja • German Ontiveros • Michael Rueda • Dale Steen
Special Asset Real Time Tracking • When will customers find out their critical assets have been compromised? • Currently, the condition of an asset during transport is not known until the asset is received and inspected at its final destination • The SPARTA team is proposing a special asset tracking system that will immediately alert a Sensor Management Center in the event a sensed parameter is beyond acceptable limits.
Master Node Package Design Overall Dimensions: 203mm x 180mm x 101mm
Sensor Node High Level Block Diagram Cutaway Dimensions
Sensor Node Physical Form Overall Dimensions: 90 mm x 90 mm x 35 mm
Overall System View Cutaway Dimensions: 114’’ x 48’’ x 96’’
Performance Requirements • Sensor Node • Power efficient microprocessor MSP-430. • ANT/ANT+ communication • Master Node • Sony Experia ARC • Wi-Fi/GSM or Iridium Satellite • Sensor Management Center • Receive data from Master Node. • Configurable GUI.
Benchmarks • Sensor • Sensor node battery beyond 2 months. • Accelerometer ±8 G-force range • Temperature 25C – 85C • Humidity 0 – 100% • Pressure 50-150K Pa, 1K Pa accuracy • Light spectral bandwidth 430 – 610 nm. • Hall effect 50 gauss trip and 5 gauss release • ANT network protocol • Sensor Management Center
Project Plans & Milestones • Research and Hardware Selection • Acquisition of Parts • Project Proposal • Sensors Node Software Development • Sensors Node Hardware Design • Master Node Software Development • Master Node Hardware Design • Validation of Components Selected • System Integration and Testing • Monday September 26, 2011 • Monday October 3, 2011 • Thursday October 13, 2011 • Wednesday November 16, 2011 • Wednesday November 18, 2011 • Thursday November 18, 2011 • Wednesday November 21, 2011 • Wednesday November 23, 2011 • Wednesday November 30, 2011
Design Cost Analysis • Design Cost • Hours per Week • Number of Weeks • Hourly Wage
System Cost Analysis • SystemCost • Sensor Costs • Radio Costs • Cell Phone • Miscellaneous