An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of COUPP Experiment in the MINOS tunnel Erik Ramberg AEM 4 February, 2008

  2. COUPP Timeline • Spring, 2004: Installation of U.of C. bubble chamber as test beam experiment T945 • Dec 2005-Nov. 2006: First engineering run resulting in 250 kg- days exposure • Nov 2006: E961 (60 kg chamber) granted stage 1 approval • July, 2007-Nov. 2007: Physics run with low background vessel • September 2007: Fermilab Wine and Cheese talk • Dec 2007: Paper approved for publication in Science magazine • December 2007: Move chamber to new location under muon veto

  3. Data from 2006 Run Energy Threshold In KeV Radon background • To be published soon in Science magazine. • Data from pressure scan at two temperatures: Solid lines: Expected WIMP response for  SD(p)=3 pb

  4. New Run of 1-liter Chamber Inner vessel has been entirely rebuilt with materials believed to have lower radioactivity. New run started July 30, 2007. Some radon introduced during filling, now decayed to equilibrium - on the order of handful of events per day

  5. Dec. 3, 2007: End of Current Physics Run Due to Acoustic Testing Unit Occluding Camera View: • Can still take data, with slightly reduced active volume • Decided not to open up chamber and spoil low background environment • - At this point we decided to move the detector under the new muon veto array to determine muon induced background

  6. Neutrons in NUMI tunnel KTEV hodoscopes were reused as COUPP -veto • neutron flux likely dominated by rock radioactivity in a site this deep. • - Muon veto and 30 cm of polyethylene potentially allow us to reach <0.1 c/kg day

  7. Move of bubble chamber from previous location in MINOS tunnel hallway, to final location under the muon veto Many thanks to John Voirin, Russ Rucinski, Todd Nebel

  8. Efficiency of Muon Veto Efficiency of veto array with respect to ADC in thick counter - Better than 95% efficient, with two nonworking top PMT’s Installed thick counter triggered by muon telescope

  9. Started up run last week and obtained ‘Golden’ event: • Muon veto coincident • NUMI beam signal coincident • Two bubble event • Observed several in first few days of running NUMI Veto Acoustic Pressure -3000 -2000 -1000 0 1000 2000 3000 Time (microseconds)

  10. MEANWHILE: • - We are contructing a • 15 kg chamber in Chicago • and a 60 kg chamber • here at Fermilab

  11. The collaboration is now planning the installation of the COUPP 60 kg chamber in the MINOS hall. One possibility is to build a water Cerenkov shield/veto for use in the NUMI tunnel that could then be transported to a deep underground site: Current New water DAQ and setup tank veto control