200 likes | 290 Views
Nuclear Physics i n Europe. The Nu clear P hysics E uropean C ollaboration C ommittee. Is an Expert C’ttee of the European Science Foundation H as currently 29 members from 20 countries Has observers from EPS (NPB) NSAC ANPHA ALAFNA
E N D
Nuclear Physics in Europe ASEPS 2013, Roundtable 2, Chiba, 16/7/13
The Nuclear Physics European Collaboration Committee Is an Expert C’ttee of the European Science Foundation Has currently29 membersfrom 20 countries Has observers from • EPS (NPB) • NSAC • ANPHA • ALAFNA Meets 3 times a year in different member states ASEPS 2013, Roundtable 2, Chiba, 16/7/13
LRP 2010: Hadron Physics PANDA @ FAIR ASEPS 2013, Roundtable 2, Chiba, 16/7/13
Phases of Strongly Interacting Matter ALICE @ LHC CBM @ FAIR ASEPS 2013, Roundtable 2, Chiba, 16/7/13
Nuclear Astrophysics NUSTAR @ FAIR HIE-ISOLDE @ CERN LUNA @ Gran Sasso ASEPS 2013, Roundtable 2, Chiba, 16/7/13
Fundamental Interactions • Neutrino masses • Direct measurements • 3H (KATRIN) • 187Re (MARE) • 0 decay • Majorana or Dirac? • Experiments in Europe • CUORE, GERDA, LUCIFER, NEXT, SuperNEMO • Nuclear matrix elements! • CPT invariance • Matter-antimatter ratios • Antiprotonic He @ AD @ CERN • ELENA @ AD @ CERN • FLAIR @ FAIR ASEPS 2013, Roundtable 2, Chiba, 16/7/13
Applications: Nuclear Medicine Small cell lung carcinoma 12C Therapy@ GSI Adenoid cystic ca. ASEPS 2013, Roundtable 2, Chiba, 16/7/13
Facilities FAIR SPIRAL2 ASEPS 2013, Roundtable 2, Chiba, 16/7/13
FAIR @ Darmstadt in Germany ASEPS 2013, Roundtable 2, Chiba, 16/7/13
FAIR: A Large-ScaleIntl. Project Signing of the FAIR Convention by representatives of the founding countriesFinland, France, Germany, India, Poland, Romania, Russia, Slovenia, Swedenin Wiesbaden on 4/10/2010 ASEPS 2013, Roundtable 2, Chiba, 16/7/13
Facility for Antiproton & Ion Research Nuclear Structure & Astrophysics (Rare-isotope beams) Hadron Physics (Stored and cooled anti-protons) SIS18 p-Linac SIS100/300 UNILAC QCD-Phase Diagram (HI beams 2 to 45 GeV/u) HESR Rare-Isotope Production Target Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Anti-Proton Production Target Materials Science & Radiation Biology (Ion & antiproton beams) CR &RESR Cryring Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) NESR Accelerator Physics ASEPS 2013, Roundtable 2, Chiba, 16/7/13
FAIR Experiments CBM APPA Super-FRS PANDA NuSTAR ASEPS 2013, Roundtable 2, Chiba, 16/7/13
FAIR Staging 2018 ASEPS 2013, Roundtable 2, Chiba, 16/7/13
FAIR Member States • All numbers in 2005 € (escalationuntil 2018 ca. +50%) • Fullmembership: • Spain expectedtojoinsoon • Talks with The Netherlands • Talks withItaly • AssociateMembership: • UK (STFC) since 3/5/13 • Talks withChina • Additional contributionstoexperimentsbymanycountries ASEPS 2013, Roundtable 2, Chiba, 16/7/13
Timeline 2011 2012 2013 2014 2015 2016 2017 2018 2019 12 9 11 6 7 8 10 Building application Site preparation First civil construction contracts Construction of accelerator & detector components Completion of basic civil construction work Installation & commissioning of accelerators and detectors Start data taking 6 10 7 8 12 9 ASEPS 2013, Roundtable 2, Chiba, 16/7/13 11
SPIRAL2 @ GANIL in Caen, France Phase 1: High intensity stable beams + Experimental halls (S3 + NFS) Phase 2: High-intensity low-energy (DESIR) & post-accelerated Radioactive Ion Beam facility CIME cyclotron RIB at 1-20 AMeV (up to 9 AMeV for FF) NFS DESIR S3 Phase 1 Current GANIL/SPIRAL1 facility SPIRAL2 LINAC LINAC: 33 MeV p, 40 MeV d (5mA) 14.5 A.MeV HI (1mA) RIB production hall Phase 2 RIB Production Cave Up to 1014fiss./sec. DESIR Low-energy RIB facility Cost of SPIRAL2: 210 M€ + 40 M€ spectrometers & detectors ASEPS 2013, Roundtable 2, Chiba, 16/7/13
SPIRAL2 Timelines I 2012 I 2013 I 2014 I 2015 I 2016 I 2017 GANIL 4 months 6 m.? 6 m.? 8 m.? 8 m.? 8 m.? GANIL AGATA at GANIL New beams SPIRAL1 (1+) End 2014 (N+) Civil Construction Phase 1 LINAC, NFS, S3 Commis -sioning Stable ion beams from LINAC SPIRL2 Phase 1 PAC NFS NFS Experiments Com. PAC S3 S3 Experiments Com. Detailed Design Study Phase 2 RIB, DESIR Civil Construction and assembly of equipment Phase 2 RIB, DESIR SPIRL2 Phase 2 PAC Phase 2 RIB LoI Day 1 SPIRAL2 Phase 2 Update ASEPS 2013, Roundtable 2, Chiba, 16/7/13
Thank you very much ASEPS 2013, Roundtable 2, Chiba, 16/7/13