CBC 7 Report to June C4. Discussions in Meeting. Next CBC Meeting Coordination with Committees GCI Work Plan Progress Development of 2009 – 2011 Work Plan CB in the Regions. CBC 8 Opportunity for inter-committee coordination. 22-24, Boulder. Coordination with Committees - ADC.
E N D
Discussions in Meeting • Next CBC Meeting • Coordination with Committees • GCI • Work Plan Progress • Development of 2009 – 2011 Work Plan • CB in the Regions
CBC 8 Opportunity for inter-committee coordination 22-24, Boulder
Coordination with Committees - ADC • CB and the GEO Portal: Accepted ADC proposal to establish a joint task team (Alan Edwards, Gordon Bridge, Hilcea Ferreira, Imraan Saloojee) • First OB – review existing requirements drafted by CBC • Second OB – assess impact • Prioritization of requirements • Feasibility of the current architecture • phasing of requirements • evaluate impact on existing Tasks (and update the GEO wp if necessary) • Third OB – start implementation (through existing or new task) • Best Practices Wiki for capturing “Good CB practice” • Hilcea Santos Ferreira • Chris Mannaerts • Possible Joint Session in Boulder
Coordination with Committees - UIC • US 06 01 • Linkage with determining CB needs (CB0701b) • UNECA contribute to user requirements in Africa • Potential UIC “call for participation” • Identification of projects provides a linkage with donor engagement task • Develop CB requirements from IGOS Theme Reports • COP’s as a vehicle to determine CB needs • Joint Session in Boulder – would require planning between co chairs
GCI and CB • IOC Task Force and CBC: Hilcea Santos Ferreira,Gordon Bridge, Alan Edwards • CBC members identifying test cases in each GEO region to provide specific user feedback on portal “usability” e.g. Kenyan Wildlife Services
Work Plan Progress • Task progressing well • Most will continue into next work plan • Excellent Progress made with Chlorogin (POGO, EC0607) , Building National Capacity (UNEP, CB0701d), Open Source (CB0701e) • Recurring theme: resources for task implementation • Resource Mobilisation • Identification of showcase projects from current tasks • Possible Meetings with Resource Providers • Task Sheets • Addition of “capacity building” info Box
2009 – 2011 Workplan:CB Overarching themes/Tasks (OAT) • Resource mobilization • Promoting education, training and certification (Build Individual Capacity to use EO) • Strengthening and building networks (Build Institutional Capacity to use EO) • Advancing Earth Observation through infrastructure development (Build Earth Observation capacity through technology transfer) • Outreach and institutional reinforcement (Continuous Needs/Gap Assessment)
OAT and the CB Strategy • The objectives outlined in the Capacity Building strategy, therefore, need to be the driver of the 2009-2011 Work Plan Capacity Building activities • The 2009-2011 Work Plan should include, realign and possibly redefine priority actions identified in the strategy • The 2009-2011 Work Plan should address the I3 of Capacity Building namely Infrastructure, Institutional and Individual • The current Work Plan largely focuses on developing the cross-cutting dimension of capacity building; a bigger focus is required in the 2009-2011 Work Plan, through sub-tasks, on developing societal-benefit-area specific capacity building activities
OAT and current tasks • Resource mobilization CB0701a • Promoting education, training and certification CB0801; AG0607; WE0605 • Strengthening and building networks EC0607; CB0701d; CB0702(will this end in 08 ?) • Advancing Earth observation through infrastructure development CB0701e; WA0607; CB0604 • Outreach and institutional reinforcement CB0701b; CB0701c;
OAT and suggestions from CBC6 + GEOSec Call • Resource mobilizationFP7 - establishing a Capacity Building advisory capability in support of Earth Observation (EO) activities • Promoting education, training and certificationBuild Individual Capacity to use EOGMOSS summer schools;GEONETCast training channelGEOBON;ForrestMonitorIRI /Gmoss Summer School • Strengthening and building networksBuild Institutional Capacity to use EOImplementing CBERS GEO CB Network; • Advancing Earth observation through infrastructure developmentBuild Earth Observation capacity through infrastructure development & technology transferCBERS,SERVIR Africa, • Outreach and institutional reinforcementCB Portal;Games ContestUser Oriented workshops for GEOSS outreach and feedback
Recommendations to C4 and Excom • Promote the identification of CB contact points in GEO Caucuses • Proposal to reduce number of committee meetings to 2 • Implications for task sheet updates