What went wrong? The IP installing the load collar on the 41/2” casing running tool (CRT) was conducting work under the

HIPO Safety Learning: Could This Happen in Your Operation? Forklift carriage lowered trapping spotter between the carriage and an adjacent slip stand. Traction #2489971. 1. 2.

rafal
Download Presentation

What went wrong? The IP installing the load collar on the 41/2” casing running tool (CRT) was conducting work under the

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIPO Safety Learning: Could This Happen in Your Operation? Forklift carriage lowered trapping spotter between the carriage and an adjacent slip stand. Traction #2489971 1 2 Spotter (IP) reaching to guide the load collar onto CRT. Head located between forklift carriage & slips stand. Spotter (IP) viewing the position of the load collar. If you’d like to know more, contact Kent Corser, Wells Program Mgr. (281) 366-2142 • Actions: • Drilling contractor will develop a procedure to safely install the load ring onto CRT from the ground for approval by Tesco prior to utilization. • Drilling contractor should get stingers installed & operational for lift operations & provide training on use of stinger. • BP & drilling contractor management to develop a structured program for pre-tower meetings to ensure an effective CoW for all tasks. • Drilling contractor to conduct training to close gaps on: forklift specs, hand signals, risk assessment & identification. • Drilling contractor will ensure any changes made will be implemented on all other rigs operated for BP in Wyoming. 3 • What went wrong? • The IP installing the load collar on the 41/2” casing running tool (CRT) was conducting work under the elevated portion of the forklift. • Forklift operator did not stop the job when the IP began to work under the elevated portion of the forklift. • Conducting work in a congested area resulted in the IP being in an unsafe position. • Incorrect use of forklift lifting chain on single fork.