1 / 18

RAJIV LIFT IRRIGATION SCHEME (BHIMA)

RAJIV LIFT IRRIGATION SCHEME (BHIMA). RAJIV LIFT IRRIGATION SCHEME (BHIMA). RAJIV LIFT IRRIGATION SCHEME (BHIMA). RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT). CATEGORY-II. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT). CATEGORY-II. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT).

rafer
Download Presentation

RAJIV LIFT IRRIGATION SCHEME (BHIMA)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAJIV LIFT IRRIGATION SCHEME (BHIMA)

  2. RAJIV LIFT IRRIGATION SCHEME (BHIMA)

  3. RAJIV LIFT IRRIGATION SCHEME (BHIMA)

  4. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) CATEGORY-II

  5. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) CATEGORY-II

  6. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Name of the Contractor : M/s R.M.M &BRC (JV) Agreement Amount : Rs. 57.97Crs. Agreement Date : 03-03-2005 Period of Completion : 24 Months (8 milestones) Date of completion : 03-03-2007 Package No. 13/Cat-II : Excavation of High level right main canal, distributary system including construction of CM & CD works from Sangambanda BR to feed ayacut of 18400 Acres. • Investigation completed : Completed • Designs : 9.2 KM approved against 24 KM • Execution (Main canal) : 15 KM length in progress against total length of 24.00KM • Qty. of earth work done : 6.00Lakh Cum against 37.32 Lakh Cum. • Qty. of concrete work done : 500 cum against 3500 cum • No. of Machinery : Deployed = 15Nos (Excavators =2 Nos.,Tipper-8Nos., T Roller- 2Nos., Dozers = 1 Nos., Water tank -1No.Crushing plant-1No.) • Land Acquisition : Required 1000 Acres, Requisition : 260 acres, Acquired – 81 acres • Expenditure : Rs. 14.90 Crs. against Rs. 57.97 Crs., • Mob. Adv. Paid : Rs. 2.90 Crs. • Mob. Adv. Recovered : Rs. 2.90 Crs. • Bottlenecks : Land Acquisition

  7. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Name of the Contractor : M/s VPR– Coromandal (JV) Agreement Amount : Rs. 68.94Crs. Agreement Date : 05-03-2005 Period of Completion : 24 Months (8 milestones) Date of completion :24-02-2007 Package No. 14/Cat-II : Excavation of High level left main canal, distributary system including construction of CM & CD works etc. to feed an ayacut of 35,800 Ac. Under Sangambanda BR, • Investigation : Completed (40.645 KM) • Designs : Main canal completed (40.465 KM) • Execution (main canal) : 28.75KM length in progress against total length of 40.645 KM • Qty. of earth work done : 18 Lakh Cum against 26.20 Lakh Cum. • Qty. of concrete work done : 1500 cum • No. of Machinery : Deployed = 29Nos (Excavators = 6 Nos., Dozers = 2 Nos, Tippers = 21Nos. etc) • Expenditure : Rs. 29.88 Crs. against Rs. 68.94 Crs., • Mob. Adv. Paid : Rs. 6.88 Crs. • Mob. Adv. Recovered : Rs. 1.68 Crs. • Land Acquisition : Required 1867 Acs, Requisition : 651 Acquired– 205.54 Acres

  8. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Package No. 15/Cat-II : Investigation, design, estimation and excavation of canal distributary system including construction of CM & CD works from Yenukunta BR, Waddewata (V), Kottakota (M), Mahabubnagar (D) to feed about 14,000 Acres upto Rangasamudram BR. Name of the Contractor : M/s Prathibha – Ch MR- (JV) Agreement Amount : Rs. 51.27 Crs. Agreement Date : 05-03-2005 Period of Completion : 24 Months (8 milestones) Date of completion : 05-03-2007 • Investigation : Completed (30.25 KM) • Design : 26.75 KM approved against 30.25 KM • Execution (main canal) : 13 KM length in progress against total length of 30.25 KM • Qty. of earth work done : 5,70,000 Cum against 20,00,000 Cum • No. of Machinery : Deployed = 28Ns (Excavators = 6 Nos., Tippers=20Nos, Leveller =2No.) • Land Acquisition : Required 943 Acres, Requisition :407Acs. Acquired – 218.71Acs. • Expenditure : Rs. 8.12 Crs. (Inc. Mob. Adv. Rs. 5.12 Crs.) against Rs. 51.27 Crs.

  9. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Name of the Contractor : M/s RNS-GSR & Co. (JV) Agreement Amount : Rs. 70.80Crs Agreement Date : 02-03-2005 Period of Completion : 24 Months (8 milestones) Date of completion : 02-03-2007 Package No. 16/Cat-II : Excavation of canal distributary system – including construction of CM & CD works from Ranga Samudram to feed an ayacut of 21,000 Acres. • Investigation (HPs) : Length 58Kms finalised against 81Kms • Execution : Excavation in 1.5 KM length in progress against total length of 81.00 KM • Qty. of earth work done : 10,000 Cum against 16,00,000 Cum • No. of Machinery : Deployed = 15 Nos (JCB-1No.Excavators = 4 Nos, Tippers-2Nos, S.Crushers- 2Nos, Hard top jeep-4Nos) • Expenditure : Rs. 3.54Crs. (Mob. Adv. Only) against Rs. 70.80 Crs. • Land Acquisition : Required 1415 Acres, Requisition: 162.34Acres Acquired – Nil • Bottle Necks : Land Acquisition

  10. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Package No. 17/Cat-II : Investigation, design, estimation and execution for converting the existing Rangasamudram tank, near Sri Rangapuram (V) Pebbair (M), Mahabubnagar district as balancing reservoir under Bhima Lift Irrigation Project (Lift-II) Name of the Contractor : M/s A L S-KVR(JV) Agreement Amount : Rs. 41.50 Crores Agreement Date : 07-03-2005 Period of Completion : 24 Months (8 milestones) Date of completion : 07-03-2007 • Investigation : Completed • Designs (Earth Bund & Weir) : 80% approved • Execution : Started • Qty. of earth work done : Cut off trench excavated for a length of 1.50 KM • Expenditure : Rs. 2.08 Crs. (Mob. Adv. Only) against Rs. 41.50 Crs. • Land Acquisition : Required 2452.30Acres, Requi.: 2526.11Acrs Acquired – Nil • Bottle Necks : Land Acquisition

  11. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Package No. 18/Cat- : Investigation, design, estimation and execution for convesting the existing Shankarasamudram tank, near Knaipally (V) Kothakota (M), Mahabubnagar district as balancing reservoir under Bhima Lift Irrigation Project (Lift-II) Name of the Contractor : M/s Sri Avanthika Saivenkata (JV) Agreement Amount : Rs. 42.10 Crores Agreement Date : 14-03-2005 Period of Completion : 24 Months(8 Mile Stones) Date of completion : 14-03-2007 • Investigation : Completed (3.69 KM) • Designs (Earth bund & Weir) : 80% of designs approved. • Execution : Yet to start (Water in the Tank & objections of Kanepally (V) for want of inclusion of village in R & R Package. • Expenditure : Rs. 2.11 Crs. (Mob. Adv. only) against Rs. 42.10 Crs. • Land Acquisition : Required 2220 Acres, Requisitioned: 1491Ac. Acquired – 1436 acres

  12. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Name of the Contractor : M/s G. H. Reddy & Associates K.K.R & Co. (JV), Agreement Amount : Rs. 36.90 Crores Agreement Date : 19-02-2005 Period of Completion : 24 Months (Milestones : 8) Package No. 19/Cat-II : Shankara Samudram Balancing Reservoir Right Main canal. • Investigation : Completed (39 KM) • Designs (HPs & Structures): approved • Execution : 34 KMlength in progress against total length of 39 KM • Qty. of earth work done : 5.5 Lakh Cum against 6 Lakh Cum. • Qty. of concrete work done: 2500 cum against 30,000 cum • Structure : 25 Nos. executed against 110 Nos. • Expenditure : Rs. 16.68 Crs. against 36.79Crores • Mob. Adv. Paid : Rs. 3.68 Crs. • Mob. Adv. Recovered : Rs. 0.70 Crs. • Land Acquisition : Required 800 Acres, Requisitioned 459 Acs Acquired – 236 acres

  13. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Package No. 20/Cat- : (i) Formation of Earth Dam of Budpur with FRL +352m (ii) Construction of spillway, (iii) Construction of Head Regulator to let out into left and right main canals. Name of the Contractor : M/s KNR-SLEC (JV), Hyd. Agreement Amount : Rs. 36.98Crs Agreement Date : 07-03-2005 Period of Completion : 24 Months (8 milestones) • Investigation : Completed (6.10 KM) • Designs : Approved • Execution : Qty. of earth work 5.64 Lakh cum completed. • Expenditure : Rs. 15.43 Crs. (Inc. Mob. Adv. Rs. 3.43 Crs.) against Rs. 36.98Crs. • Mob. Adv. Recovered : Rs. 1.37 Crs. • Machinery deployed : Excavator-1No., Tippers-5No., Dozer-1No., Other M/C-7Nos. • Land Acquisition : Required 2073.11 Acres, Requisitioned- 2073.11 Acs Acquired – 358Acs.

  14. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Package No. 21/Cat-II : Investigation, Designs and excavation of left main canal, distributary system including construction of CM & CD works from budpur Balancing reservoir, Budpur (V), Atmakur (M), Mahabubnagar (D) to feed about 32,000 Acres Name of the Contractor : M/s S.V.E.C Co., Hyd. Agreement Amount : Rs. 60.39 Crores Agreement Date : 25-02-2005 Period of Completion : 24 Months (milestones) • Investigation : completed (32 KM) • Designs (HPs & Structures) : Length 28.65 Km approved against 37.825Kms. • Execution (Canal) : 28.10KM length in progress against total length of 37.825KM • Structures : 13 Nos. executed against 79 Nos. • Machinery deployed : 10Nos. (Tippers-4Nos, Poclains-4Nos, DRR-1No,Dozer-1No.) • Land Acquisition : Required 1386 Acres, Requisitioned: 316Acs Acquired – 98 Acs. • Expenditure : Rs. 18.04 Crs. (inc. mob. Adv. Rs. 6.04 Crs.) against Rs. 60.39 Crs. • Bottle necks : Land acquisition – not handed over by Revenue authorities

  15. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Package No. 22/Cat- : Investigation, Designs and excavation of right main canal, distributary system including construction of CM & CD works from budpur Balancing reservoir, Budpur (V), Atmakur (M), Mahabubnagar (D) to feed about 32,000 Acres Name of the Contractor : M/s S.V.E.C Co., Hyd. Agreement Amount : Rs. 26.73 Crores Agreement Date : 25-02-2005 Period of Completion : 24 Months (8 milestones) • Investigation : Completed (15.025 KM) • Design (HPs) : Approved • Execution (Canal) : 14.50KM length in progress against total length of 15.025KM • Qty. of earth work done : 2.86 Lakh cum against 2.95 Lakh cum • Qty. of concrete work done: 5200 cum • Structures : 23 Nos. executed against 54 Nos. • Expenditure : Rs. 14.68 Crs. (Inc. Mob. Adv. Rs. 2.68 Crs.) against Rs. 26.73 Crs. • Mod. Adv. Recovered : Rs. 0.73 Crs. • Machinery deployed : 13Nos. (Tippers-4Nos, Poclains-7Nos, DRR-1No,Dozer-1No.) • Land Acquisition : Required 354 Acres, Requisitioned: 212Acres Acquired – 128 Acs. • Bottlenecks : Land acquisition

  16. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Package No. OC (Pkg. 27): Investigation, Design, excavation of left main canal, distributary system including construction of CM & CD works from Sankarsamudam Balancing Reservoir . Name of the Contractor : M/s KNR Const. Ltd. & BPL (JV) Agreement Amount : Rs. 149.40Crs. Agreement Date : 9/2005 AGREEMENT DATE : 9/2005 INVESTIGATION and DESIGNS are in PROGRESS Financial – Rs. 7.47 Crores (Mob. Adv. Only) against Rs. 149.40 Crores • Land Acquisition: • Required : 3,000 Acs. • Requisitioned : 169.95 Acs. • Acquired : Nil

  17. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Package No. EPC / OC- : LIFT-I : Design, manufacture, supplying & erection of pumps, motors, electro mechanical works, including tunnel, cistern and pump house etc. Name of the Contractor : M/s Patel Engineering Ltd. Agreement Amount : Rs. 383.349Crores Agreement Date : 07-03-2005 Period of Completion : 30 Months (10 milestones) • Investigation :Completed (3.0725 KM) • Designs (Tunnel, Pump House, Surge pool, Cistern): 2.70 KMapproved against 3.0705 • Execution : Excavation in progress (approach channel, tunnel, surge pool & Pump house) • Qty. of earth work done : 5.50 Lakh Cum against 7.82 Lakh Cum. • No. of Machinery : Deployed = 8 Nos (Excavators = 6 Nos., Dozers = 2 Nos. etc) • Land Acquisition : Required 250 Acres, Requisitioned 218Acs Acquired – 111 Acs. • Expenditure : Rs. 52.16 Crs. against Rs. 383.34 Crs. (Mob. Adv paid – Rs. 19.58 Crs.) • Mob Adv. Recovered : Rs. 1.61 Crs. • Bottlenecks : Land Acquisition

  18. RAJIV LIFT IRRIGATION SCHEME (BHIMA PROJECT) Package No. EPC / OC- : Design and execution of Stage-I and stage-II pumping stations of lift-II at Thirumalayapalli & Kothakota (M), Mahabubnagar (D) on EPC basis. Name of the Contractor : M/s NEC – NCC – MAYTAS (JV) Agreement Amount : Rs. 391.55 Crores Agreement Date : 14-03-2005 Period of Completion : 30 Months • Investigation : Completed (3.132 Kms) • Designs (Tunnel, Pump House, Surge pool, Cistern): Approved • Execution : Excavation 0.383Km in progress (approach channel, tunnel, surge pool & Pump house) • Qty. of earth work done : 1,70,000 Cum against 5 Lakh Cum. • No. of Machinery : Deployed = 18 Nos (Excavators = 4 Nos., Dumpers = 12 Nos., Dozers = 2 Nos. etc) • Land Acquisition : Required 135 Acres, Requisitioned 67 Acs. Acquired – Nil • Expenditure : Rs. 71.58 Crs. against Rs. 391.55 Crs. • Mob. Adv. Paid : Rs. 19.58 Crores. • Mob. Adv. Recovered : Rs. 6.00 Crores.

More Related