Undulator Development R&D Plan

Undulator Development R&D Plan. Toshi Tanabe George Rakowsky, John Skaritka, Steve Hulbert, Sam Krinsky, Timur Shaftan and Other NSLS2 Staffs NSLS-II NSLS-II Accelerator Systems Advisory Committee 2007/04/23-24. Outline. Permanent Magnet Damping Wiggler

rafer
Download Presentation

Undulator Development R&D Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Undulator Development R&D Plan Toshi Tanabe George Rakowsky, John Skaritka, Steve Hulbert, Sam Krinsky, Timur Shaftan and Other NSLS2 Staffs NSLS-II NSLS-II Accelerator Systems Advisory Committee 2007/04/23-24

  2. Outline • Permanent Magnet Damping Wiggler • Elliptically Polarized Undulator (EPU) • 3 Pole Wiggler • Cryo-Permanent Magnet Undulator (CPMU) • Cold Measurement System • Cold Gas Refrigeration System • New Magnet / Pole Materials • New Gap Separation Mechanism • Superconducting Insertion Devices • SCU, SCW and SEPU • High Temperature Superconductor (HTS) • Undulator Laboratory

  3. 1) PM-Damping Wiggler • CDR DW (lw=100mm, Gap=15mm) • Br=1.35T • Integral of B2=0.1459 T2.m (90.0% of ideal 1.8T sinusoidal field=0.162 T2.m) • Keff/g = 2.71 mrad • New Design with side magnets (lw=80mm, Gap=12mm) • Br=1.30T • Integral of B2=0.1334 T2.m (103% of ideal 1.8T sinusoidal field=0.1296 T2.m) • Keff / g = 2.32 mrad Side Magnets W100 W80

  4. Effect of Pole Width in Dynamic Aperture [Horizontal Field Profile] • 65% Pole Width=52mm (Br=1.32) • Pole Width=80mm (Br=1.30) kx=0.0026 kx=0.0058 • 45% Pole Width=36mm (Br=1.40) kx=0.017

  5. Tracking Result Up to 13th longitudinal harmonics are included

  6. 2) EPU Comparison • Apple-II v.s. HiSOR EPU second order kicks (Elleaume, EPAC 1992):

  7. Radia Kick Map (Helical Mode) • HiSOR [Vertical Kick] • Apple-II

  8. Radia Kick Map (Helical Mode) • HiSOR [Horizontal Kick] • Apple-II More ellaborate trackings will be conducted

  9. 3) 3 Pole Wiggler • Requirements: • More than 2 mrad of radiation fan above 1T field • Use narrow gap dipole (35 mm Gap) chamber • Fixed gap and removable from one side of the chamber • Placed next to a BM  Cross talk issues are being investigated (3D model) Preliminary Magnetic Design 16mm 17.5mm Br=1.35T Permendur Center Pole Soft Iron (1006) Side Poles Rectangular Magnets S [mm]

  10. By, Angle, Trajectory Red lines show the fanning angle required by the users

  11. 4) CPMU Japanese/European Efforts on Cold Measurement System SPring-8 (Courtesy of T.Tanaka) ESRF (Elletra Workshop 06)

  12. Our Approach • Detachable system from side opening  Dedicated measurement chamber (SP8/ESRF) • Adaptable positioning system using feed back from laser tracker for Hall probe • Hope to adapt the stretched wire system design by ESRF • Stable square shape pulse generator with a flat-top longer than 15msec has to be developed for pulsed wire measurement with 3.5m device

  13. New Materials • Latest PrFeB Magnet • New CR53 from Hitachi Metal 3.0 B [T] • Crystalized Dysprosium Pole • Very high saturation flux density ~ 3.5T • Vanadium permendur ~ 2.3T • Soft iron ~ 2.1T • W. Swift and M. Mathur IEEE Trans. Mag. Vol.10, No.2 (1974) H [105 A/m]

  14. New In-vacuum Gap Separation Mechanism Linear motors drive the outer cage. Vacuum chamber Rail

  15. Impproved Cold Gas Refrigeration System • Linear motor to pump the gas instead of compressed air activated cylinder • Triple stage cryocoolers to cover wide temperature range • It will be tested to cool down the LDRD funded HTS sextupole proto type (shown on the right)

  16. 5) Superconducting Insertion Devices • Low Temperature Superconducting Undulator/ Wiggler • Test APC-NbTi wire • Low TemperatureSuperconducting EPU • Design study, especially winding technique • High Temperature SC Devices • Rapid conductor development in the industry • New type such as coated conductor and thin film available More design flexibility • Once the conductor exceeds the necessary performance level, it will be very promising candidates for future IDs

  17. Insertion Device Laboratory • Class 10000 Temperature Controlled Semi-Clean Room for IVU Measurement • Metalic dust is very hard to remove after assembly. • Prevent bugs from entering hard-to-reach area. • 22 °C± 0.2 °C or tighter (Cf. LCLS MMF: 20 °C± 0.1 °C) • Low vibration required by pulsed wire measurement • Standard ID measurement setups • 6-7 m Hall probe bench • Stretched / pulsed wire system (3-4m) • Cold Measurement Apparatus • Dedicated cold measurement system with independent refrigerator • Hall probe calibration setup in controlled temperature • Winding Machines for SC device development • CAD to CAM system for yoke fabrication

  18. Summary • DW may require further refinement to reduce the impact on the ring. • How much of the longitudinal harmonics can be tolerated? • More rigorous trackings will determine optimal structure of EPU for NSLS-II. • 3 pole wiggler will be conventional PM device, however; • Magnetic interaction with adjacent magnets should be taken into account • Residural dispersion due to asymmetric beta function at the location has be to minimized. • Development of accurate cold field meamsurement system is essential for successful operation of CPMU. • New materials to be developed for higher performance • New gap separation mechanism to simplify the structure • SC insertion devices planned for NSLS-II require further R&Ds. • Undulator Laboratory must have state-of-the-art measurement system to be competitive for next 20 years of operation.