International Nuclear Energy Development of Japan (JINED)

Human Resources Development Program for Ninh Thuan 2 -From Japanese Utilities` Standpoint- Takashi Mizuno JINED International Nuclear Energy Development of Japan ATOMEXPO2013 June 28th. 1. 1. International Nuclear Energy Development of Japan (JINED). Established in October 2010

raine
Download Presentation

International Nuclear Energy Development of Japan (JINED)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Human Resources Development Program for NinhThuan 2 -From Japanese Utilities` Standpoint-Takashi Mizuno JINEDInternational Nuclear Energy Development of Japan ATOMEXPO2013June 28th 1

  2. 1 International Nuclear Energy Development of Japan (JINED) • Established in October 2010 • Funded by 9 utilities, 3 nuclear power plant manufactures and 1 public-private company • Promote NPP construction project in emerging countries by implementing cooperative activities • Vietnam is the first counterpart. Equipment Procurement Contract (EPC) Emerging countries < Vietnam > Intergovernmental cooperation Cooperative activities Japanese gov. Financing JINED Financial institutions Project promotion New project raising utilities *1 JAIF/JICC *2 Other related companies Plant manufacturers *1: JAIF (Japan Atomic Industrial Forum, Inc) JICC (JAF International Cooperation Center) *2: ex. Innovation Network Cooperation of Japan (INCJ)

  3. 2 Overview of NPP Project in Vietnam NinhThuan NPP Projects • Target years of starting commercial operation • 1st units of NinhThuan NPPs 2020 • 2nd units of NinhThuan NPPs 2021 • Feasibility Studies (FS) will be reviewed. Ha Noi Potential site for NinhThuan No.2 NPP in Vinh Hai VinhHai NinhThuanNo.2 NPP, units 1 & 2 (Japan) PhuocDinh NinhThuanNo.1 NPP, units 1 & 2 (Russia) HCMC

  4. 3 Structure of Cooperation Japanese side Vietnamese side Intergovernmental Arrangement Gov. of Viet Nam (MOIT) Gov. of Japan (METI) Government (MOC) submitting Feasibility Study (FS) for governmental review and approval performing Feasibility Study (FS) JAPC Project Executing Entities MOU JINED EVN Cooperating for moving forward with the NinhThuan -2 Project 3 Venders- Toshiba, Hitachi, MHI 9 Japanese Utilities regulating MOU JNES VARANS Regulators MOU R&D JAEA VINATOM

  5. 4 Six Requirements by Vietnamese Gov. 1.Proven and Advanced Technology 2.Financial Support 3.Support in Human Resources Development 4.Stable Supply of Nuclear Fuel 5.Support in Spent Fuel and Radioactive Waste Management 6.Support in Development of Nuclear Industry in Viet Nam

  6. 5 NinhThuan#2HRD Basic Concept Future management team (Approx. 10 % of Employees of NPP) Core members 【Note】 At Japanese NPP (1000MW、2 units) Total :400- 600 employees Engineers, support management team Subcore members Maintenance Team – EVN or outsoursing ?

  7. NinhThuan #2HRD Road Map (tentative) 6 EVN Organization Pre-construction Office Construction Office NPS ▽EPC contract ▽Start Operation ▽Reactor Type Selection 1st group 2nd group 3rd group 4th group Training under EPC contract OJT – Japanese NPP, Factory OJT – at NinhThuan Site Detailed Design, Procurement, Manufacturing, Assembling at Japanese Factory participate Civil Work Test Operation Construction Simulator design Simulator Construction Simulator Training

  8. 7 Basic Schedule forCore members @Tokai Univ.

  9. 8 Core MembersSelection Criteria -Select from EVN Employees -University Graduates (Technical degree) -Young and Skilled Engineers (preference age ; 25 -35 years old) -Strong Motivation to Nuclear Project -Prefer to work at NinhThuan Local Area

  10. 1 Nguyen The Phong PECC3 Project Staff Tenure 3.5yrage 28 Da Nang Univ. of Tech HCMUT 6 2 Dang Phuoc Toan PECC2 Electric Engineer Tenure 7yrage 30 HCMUT 7 Nguyen The Linh EVN BuonKoup Hydro Power Company Chief operator of Shift Tenure 5yrage 29 Da Nang Univ. of Tech 3 Nguyen Huu Huan EVN Ialy Hydro Power Company Head of Shift operator Tenure 8yrage 33 Da Nang Univ. of Tech 8 Tran Van Luat EVN Phu My Thermal Power Company Vice Mgr. (Electrical maintenance Dept.) Tenure 12yrage 38 HCMUT/Griggs Univ. 4 Tran Van Tuat EVN Ialy Hydro Power Company Head of Shift operator Tenure 9yrage 34 Da Nang Univ. of Tech 9 5 10 9 Tokai University Core Member 1st Group (page-1) Head of group Tenure 6yrage 29 Da Nang Univ. of Tech Le Van Thai EVN BuonKoup Hydro Power Company Pham Van Mao EVN Dong Nai Hydro power Company Electric Engineer Tenure 1yrage 25 HCM University of Industry Head of group (Management and operation) Tenure 6yrage 33 Da Nang Univ. of Tech Vo Ngoc Thai EVN BuonKoup Hydro Power Company Vo Vi Na EVN Phu My Thermal Power Company Team leader of I&C Tenure 10yrage 34 HCMUT

  11. 10 Tokai University Core Member 1st Group (page-2) 11 Nguyen Ngoc Thach EVN BuonKoup Hydro Power Company Mechanical Engineer Tenure 7yrage 30 HCMC Tech. Teacher Training Univ. 12 Le Quang Bao EVN Song Ba Ha Hydro Power Company Mechanical Engineer‏ Tenure 6yrage 34 HCMC Tech. Teacher Training Univ. 13 Tran Trong Thoai EVN Song Ba Ha Hydro Power Company Mechanical Engineer Tenure 7yrage 34 HCMC Tech. Teacher Training Univ. 14 Vo Anh Tuan EVN NPB NPB Staff of Construction Management Dep. Tenure 2yrage 27 HUST NPB Vice Mgr. Tenure 11yrage 33 Da Nang Univ. of Tech 15 Nguyen Van Mua EVNNPB

  12. 11 One Day at Tokai Univ. 【Đề tài trong tuần】 Ngày 11/9/2012 đã đến đại học Tokai Rất ngạc nhiên khi thấy trường đại học Tokai rộng lớn quá (Thứ sáu)ngày 14/9 đã đến dự lễ khai giảng. Đoàn trưởng Đại diện du học sinh đoàn trưởng Nguyễn văn mua có nhận cuộc phỏng vấn của tờ báo đại học ”Trước tiên là muốn học tập cho tốt Nhật ngữ. Kế đến muốn học được tốt công nghệ điện hạt nhân tiên tiến của Nhật Bản. Sau khi về nước tôi sẽ cố gắng làm việc để đóng góp vào sự phát triển của đất nước thông qua hoạt động an toàn của nhà máy điện hạt nhân.”

  13. 12 Tokai Univ. Program Contents 【Expectationfor Core members 】 Promote NinhThuan #2 Project as Key Players And Train Sub-core Members as Mentors 【Program Contents】 ・Basic Knowledge for Nuclear Power Generation and Nuclear Fuel Cycle ・Special Knowledge - Nuclear Physics, Design, Reactor Control, Radiological Protection, Health Physics, etc. ・Practical Knowledge for Safety and Stable Operations based on International Standards, Quality Management Standards ,etc ・Project Management Skills for harmonizing various construction activities ・Ethic Rule, Compliance, Safety Culture for leaders ・Leadership to collaborate with EVN members and Contructers ・Communication skills with Local residents for PA purpose

  14. 13 EVN Presentation at IAEA (Oct.2012)

  15. 14 EVN Presentation at IAEA (Oct.2012)

  16. 15 Challenges • To Establish Training Program for EVN Core members at Tokai Univ. • To Select Criteria for Second Group of EVN Core members • To Harmonize VN and JP Gov. Educational Framework • for Young Students • (example) • High School in VN - Japanese Language Courses (JP-ODA) • Under Graduate - Incentive No.1558/QD-TTg(VN) • Master Degree - Incentive No.599/QD-TTg(VN) • - JDS scholarship (JP-ODA) • EVN NinhThuan #2 Staff On-the-Job training System • Support EVN for New Employee Recruiting

  17. Thank You ! Спасибо! Spasibo! Trân trọng cám ơn ありがとう!