1 / 10

Relay Pumping

Relay Pumping. TS-12. Task Standard 12. Attack. Engine positions for attack. Task Standard 12. Attack. Source. Source engine will spot for a reverse lay. Task Standard 12. Attack. Source. Source engine proceeds to hydrant. Task Standard 12.

rainer
Download Presentation

Relay Pumping

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Relay Pumping TS-12

  2. Task Standard 12 Attack Engine positions for attack

  3. Task Standard 12 Attack Source Source engine will spot for a reverse lay

  4. Task Standard 12 Attack Source Source engine proceeds to hydrant

  5. Task Standard 12 Source engine will connect 5” bypass to hydrant with 2 ½” valve Connect 5” to discharge Attack Source Attack engine will connect 5” to intake

  6. Relay Pumping TS-12B

  7. Task Standard 12B Attack Source Staged at a hydrant

  8. Task Standard 12B Attack Source Loop hydrant, leave 2 ½”valve and proceed to forward position when assigned

  9. Task Standard 12B Attack Source

  10. Task Standard 12B Connect 5” bypass to hydrant with 2-2 ½” valves Attack Source Connect 5” to discharge Connect to intake

More Related