110 likes | 213 Views
Test Series MIL03. Test setup, Instrumentation, and Coordinate systems Prepared by: Mahadevan Ilankatharan. 2-SS-Hy. 1-M. 1-L. 1-S. S. N. 2-LS-Lt. 2-LS-Hy. 2-LL-Hy. Nomenclature of structures. N. Global origin. Y. Z. X. 1-L. 2-LS-Hy. 2-SS-Hy. 2-LL-Hy. 1-S. 1-M. 2-LS-Lt.
E N D
Test Series MIL03 Test setup, Instrumentation, and Coordinate systems Prepared by: Mahadevan Ilankatharan
2-SS-Hy 1-M 1-L 1-S S N 2-LS-Lt 2-LS-Hy 2-LL-Hy Nomenclature of structures
N Global origin Y Z X 1-L 2-LS-Hy 2-SS-Hy 2-LL-Hy 1-S 1-M 2-LS-Lt S Top View
Base & Container ring Global origin X Y a10 Z W E A3 A6 A4 a11 a9 A1 A2 North End L26 W E A5 A7 South End
2-LL-Hy S L2 L1 L3 a57 Pile 1-2 Pile 1-1 x Local origin 1 a53 y a51 z A36 N
2-SS-Hy S L5 L4 a63 L6 Pile 3-2 a59 Pile 2-2 x a65 a61 y Local origin 2 A37 z N
2-LS-Hy S Instrument rack (North) L9 L7 L8 a13 L10 Pile 5-2 (short pile) A46 a8 Pile 5-1 (long pile) L11 x A45 a6 L12 a7 y Local origin 3 A38 z A39 N
2-LS-Lt S A41 A40 a31 A48 a29 a32 L18 a30 L16 L17 x Pile 6 (long pile) Pile 4-2 (short pile) A47 L25 y Local origin 4 L15 L13 z L14 N
1-L S L19 a13 a15 a16 x a12 Pile 3-1 a14 y Local origin 5 z A42 N
1-M S A44 Pile 2-1 a26 a27 x a25 a28 z y Local origin 6 L23 N
1-S S L21 L20 a3 L22 a2 x Pile 4-1 a5 a4 y a1 Local origin 7 z A35 N