Work measurement techniques
For Assignment Solution Contact Casestudyhelp.in https://www.casestudyhelp.in 9422028822 Production Management 1. A small manufacturer buys a set of steel brackets at Rs. 40 per pair. He does havethe capacity to produce the same at his workshop. However he has to incur a fixed cost of Rs. 30,000 and a variable cost of Rs. 10 per pair of brackets. He has firm orders for 2000 assemblies each requiring a pair of brackets. His selling price is Rs. 16 per pair of brackets. What should he do ? Buy brackets or produce them himself. 2. "Good working conditions lead to higher productivityâ€. Discuss. 3. Discuss the factors to be considered while selecting a "Factory site" 4. Explain the various factors to be cionsidered in rating a vendor. 5. Assume that a company has just committed to change from a traditional style of management to one based on TQM. Explain the importance of employee involvement and empowerment in implementing the TQM. 6. Name of the tasks, task times and required immediate predecessors are given below for a food processing plant: Task Task Time (in Immediate minutes) Predecessors A 3 None B 6 A C 7 A D 5 A E 2 A F 4 C,B G 5 C H 5 D,E,F,G The Plant has desired output of 7600 units per week. The plant operates for 5 days per week, three shifts per day and eight hours per shift at 90 percent efficiency. Draw the precedence diagram. Calculate the required cycle time, line efficiency and balance delay, for the above operations. 7. Briefly discuss the concepts of JIT in the context of manufacturing systems. What are the most critical things needed to implement JIT? Discuss how JIT reduces costs of material, labour and overheads. Write short notes on the following : (i) Quality assurance and total quality (ii) Economic Order Quantity (EQQ) (iii) Advantage of process layout (iv) Work measurement techniques For Assignment Solution Contact Casestudyhelp.in https://www.casestudyhelp.in 9422028822
131 views • 7 slides