An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Badarpur BADARPUR THERMAL POWER STATION (ISO 9001 / ISO 14001 POWER STATION) WELCOME

  2. Badarpur • BTPS • BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY CONSUMPTION • INSTALLED CAPACITY 720 MW • DERATED CAPACITY 705 MW (3x95 + 2x210MW) • OWNED BY GOVT. OF INDIA, MINISTRY OF POWER • BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978. • NTPC adjudged as the 3rd best employer in India

  3. Badarpur • INTRODUCTION • BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region. • The site construction activities started in 1968. • The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.

  4. Badarpur • Our Core Values • Customer Focus • Organisational Pride • Mutual respect and Trust • Initiative and Speed • Total Quality

  5. Badarpur • INTRODUCTION • For the past 29 years & in its 30th year of operation, BTPS has been moving from strength to strength. • Achieved new heights in Generation, Availability and substantial reduction in inputs; thereby demonstrating overall efficiency in plant performance, towards its end-objective of providing power to the Capital. • In spite of the old and aging units, PLF of BTPS has remained higher than the National Average for the last 16 consecutive years. • Amongst Top 20 Power Stations of India current FY 8th position. • Achieved all our MOU Targets with Excellent Rating.

  6. Badarpur *TILL OCT’04 Major breakthrough Above 80% PLF achieved from 1999-00 onwards BTPS ACHIEVED QMS AND EMS IN 2000

  7. Badarpur • Factors Responsible for Sustained performance of BTPS • O&M Practices • To maximise availability and maximise efficiency in sustained manner • Integrated Approach adopted towards implementation of the following systems: • Maintenance Management System • Operations Management System • Efficiency Management System • Renovation and Modernisation

  8. Badarpur • Maintenance Management System • Objective:Maximizing Availability Through: • Identifying maintenance needs and applying appropriate maintenance methods and their implementation in time bound manner. It involves: • Long Tem Planning • Short Term Planning • System Planning • Predictive Maintenance • Breakdown maintenance reduction • Renovation and Modernization

  9. AWARDS Badarpur • MOP’s Meritorious Productivity Award: • For calendar years 1987, 1988, 1990. • For financial years 92-93, 94-95 and 97-98 • Received Bronze medal in 1998-99 and • Received Silver shield and certificate of Meritorious performance for 2000-01. • Received Gold shield and Certificate for outstanding performance three consecutive years 01-02 & 02-03 , 03-04. the awards were presented by Hon’ble President of India and Hon’ble power Minister on 24 August 2004.

  10. Badarpur

  11. Badarpur

  12. Badarpur • ENVIRONMENT MANAGEMENT • RECEIVED GOLDEN PEACOCK AWARD 2003 FOR ENVIRONMENT PROTECTION AT PALAMPUR,HP. • RECEIVED INDO-GERMAN GREENTECH EXCELLENCE • AWARD FOR ENVIRONMENT PROTECTION FOR THE • YEARS 2001 & 2002. • RECEIVED CORP. ENVT. AWARD OF NTPC FOR 2000- 2001. • APPRECIATION CERTIFICATE FROM CHIEF MINISTER, DELHI TO THE TEAM OF BTPS FOR PARTICIPATION IN YAMUNA CLEANING ABHIYAN.

  13. Badarpur • ENVIRONMENT MANAGEMENT • APPRECIATION CERTIFICATE FROM SECRETARY (ENVT) CUM CHAIRPERSON, DPCC FOR ENVIRONMENT MANAGEMENT. • MASSIVE TREE PLANTATION, EVEN IN ADOPTED LAND. • BTPS HAS RECEIVED AUTHORISATION FOR DISPOSAL OF BIO - MEDICAL WASTE FOR THE FIRST TIME. • CONSENT HAS BEEN GRANTED FOR HAZARDOUS WASTE MANAGEMENT.

  14. Badarpur • ENVIRONMENT MANAGEMENT • Station bagged IOC rolling trophy for reduction in fuel oil consumption for 98-99. • Greentech Industrial Safety Award 01-02, declared winner of Gold Award in Thermal Power Sector for outstanding achievement in the area of Industrial Safety – on 26.6.02.

  15. Badarpur • AWARDS • British safety award for 1988, 1994 and 1999. • One employee bagged the Vishwakarma Rashtriya Puraskar in 1994 from Ministry of Labour. Six employees have been given the same award for 1998. • 6 BTPS employees were awarded under Delhi Shramik Sujhao Yojna Puraskar’97 & • Another 8 employees have been awarded under Delhi Shramik Sujhao Yojna Puraskar’98 at Vigyan Bhawan on 20th Aug’02by Chief Minister of Delhi.

  16. AWARDS Badarpur • BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management by Greentech foundation for 2003-04 • BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03 • BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04 • BTPS received golden peacock award for it innovations for 2003-04 BTPS received golden peacock award for IT Innovations for 2003-04

  17. Badarpur

  18. Badarpur HR Initiatives contd. • Training enphasis for all employees atleast 7 days in a year , Up-gradation of technical knowledge and skill through retraining and monitoring of learning index. • Responsibility accounting & Subordinate development. • Inspiring people to become leaders at all levels. • Implementation of the concept of “HR Ambassadors”.

  19. Badarpur HR Initiatives contd. • Conducting Mass Communication Meetings at various levels like GM, HOD etc. for providing an open platform for sharing the views related to all the fields amongst employees. • Continuous enhancing of personal effectiveness through innovative reward and recognition. • Implementation of “5S” System on a pilot project basis.

  20. Badarpur HR Initiatives contd. Quality Circles • 112 QCs are operating in the station. • At National Convention of Quality Circles (NCQC-2000) • “Chetna” QC of BTPS bagged first award in category “Best of Manufacturing Support Stream”. • Our other QC namely “Chakra” won “Best of The Session Award” in the same contest. • Quality Circle ‘Chakra’ won Distinguished Category Award at the 15th National Convention held at Hyderabad (NCQC-2001).

  21. Badarpur HR Initiatives contd. QUALITY CIRCLES • AT CCQC-2002 QCFI (MADURAI CHAPTER) FROM 28/06/02 TO 29/06/02, CHAKRA QC WON DISTINGUSED CATEGORY PRSENTATION AWARD. • AT CCQC-2002 (DURGAPUR CHAPTER) FROM 12th TO 13th JULY 2002, ABHIGYAN QC WON 1st PRIZE IN SERVICE GROUP. • AT INTERNATIONAL QUALITY CIRCLE CONVENTION -2002 (LUCKNOW ) WHICH WAS HELD ON 17-20 DEC 2002, THREE QC TEAMS - CHETNA , CHAKRA & TARANG PARTICIPATED & CHETNA WON DISTINGUISHED CATEGORY AWARD.

  22. Badarpur HR Initiatives contd. Professional Circles • 10 Professional Circles in the station • Suggestion schemes • 1.15 Suggestions received per employee per annum against MOU target of 1 suggestion per employee per annum • Employee satisfaction surveys • NTPC ranked 3rd in the Business Today –Hewitt best employers in india 2003 survey • TPM • Step -2 of Jhishu Hozen completed for all 8 manager model machine and horizontal spread for other areas in progress.

  23. Badarpur • Health care and SOCIAL ACTIVITIES • BTPS Hospital covered in ISO-9001. • Medical relief work during • cyclone affected Orissa • Earth quake in Gujarat • Cancer detection camp, Bone Density Camp & Diabetes Education Camp • Eye camp and Pulse polio program • Blood Donation camp and Annual Health checkup • Check up for school children • Deepshikha ladies club charitable dispensary

  24. Badarpur GOAL YEAR OF EXCELLENCE - TPM - POG - DISHA - RCM - WORK SHOP BASED MAINTENANCE - CENTRALISED LUB OIL CELL - PG TEST FOR ALL EQUIP. - BENCHMARKING PROJECTS - FAILURE/B.DOWN ANALYSIS - KNOWLEDGE MANAGEMENT - SIX SIGMA - SITE VISIT - MERIT ORDER OPERATION - VARIABLE COST ANALYSIS ON MICRO LEVEL - SPARE PARTS RECLAMATION - HEAT RATE IMPROVEMENT - TEST CENTRE FOR SUBASSEMBLIES - WATER MANAGEMENT - DRY ASH UTILISATION - BRICK MANUFACTURING - MERIT ORDER OPN. IN WTP OF IND. STREAMS - FAILURE/B.DOWN ANALYSIS IN WTP - PMS - TEAM BLDG. - EMPOWERMENT - TASK FORCES - TRAINING CALENDER - MASS COMMUNICATION MEETING - TRNG.FOR - CONT.LABOUR - FILM ON TECH. ISSUES - INTERNAL CUSTOMER MEET - CORE GROUP - INDUSTRIAL RELATIONS - VISION & VALUE ACTUALISATION - DISHA - UPGRADATION OF OFFICE AND WORKING ENVIRONMENT - 5S - SUMMER COACHING FOR CHILDREN - FREE EDUCATION FOR NEIGHBORHOOD GIRLS - EXTERNAL CUSTOMER MEET IT - SITE STORES - E-PROCUREMENT - E-AUCTION - DRG. DIGITIZATION - DOC. CENTRE - RATIONALIZATION OF CONTRACTS - CONT. MGMT SYSTEM - MATERIAL MGMT. SYSTEM - SPARE PARTS DEVELOPMENT CELL - STANDARDISATION OF QUALITY PLAN - WORK SPECIFICATION - STANDARDISATION OF ISOLATION CHECKLIST - DEFECT STANDARDISATION & CODIFICATION - SITE MAINTENACE QUALITY PLAN - ANN. RATE CONTRACT - VENDOR ENLISTMENT - RAIN WATER HARVESTING - VERMICULTURE Technical Systems - E-DESK - CONTR. PROCESSING (ORACLE) - ONLINE COAL MONR. SYSTEM - ONLINE FINANCIAL ACCOUNTING SYSTEM - MATERIAL MANAGEMENT SYSTEM - MIS FOR SR. EXECUTIVES - ANURAKSHAN SYSTEM Support Services

  25. Badarpur BTPS received golden peacock award for IT innovations for 2003-04

  26. Badarpur THANK YOU