醫院整建過程中之感染管制. 衛生署 疾病管制局 中區傳染病防治醫療網 王任賢 指揮官. 院感人員在醫院整建中之角色. 主要任務 由感染管制的角度監控整個營建及改建之進行,包括計畫之擬定、修訂、工程執行、及後續之監控. 建築過程相關之感染殺手 : Aspergillus sp. 建築過程相關之感染殺手 : Legionella sp. 微生物之來源 : I. 黴菌斑、灰塵、土壤均會受黴菌孢子與細菌污染 天花板、絕緣材質、防火材質、牆壁剝落物 黴菌孢子可由戶外飛入 ( 敞開的窗戶或未密閉的窗戶 ). 微生物之來源 : I I. 水管系統
E N D
醫院整建過程中之感染管制 衛生署 疾病管制局 中區傳染病防治醫療網 王任賢 指揮官
院感人員在醫院整建中之角色 • 主要任務 由感染管制的角度監控整個營建及改建之進行,包括計畫之擬定、修訂、工程執行、及後續之監控
微生物之來源: I • 黴菌斑、灰塵、土壤均會受黴菌孢子與細菌污染 • 天花板、絕緣材質、防火材質、牆壁剝落物 • 黴菌孢子可由戶外飛入(敞開的窗戶或未密閉的窗戶)
微生物之來源: II • 水管系統 • 水管漏水會造成天花板潮濕 • 灰塵與黴菌四散 • 換新水管時土壤中的Legionella sp.可以因此而進入水管系統
微生物之來源: III • 空調系統 • 空調系統若有不完整將使營建區的空氣流通至病患區域 • 空調系統並未完全密閉 • 不正確的壓力差 • 不正確之空氣交換 • HEPA filters沒有保養
Risk factors of patients and environment • Exposure to construction and soil excavation
Risk factors of patients • Patient characteristics • underlying medical conditions • immunosuppressive conditions • GVH disease, prolonged neutropenia / granulocytopenia,prolonged use of antibiotics, steriod therapy • dialysis and mechanical ventilation, smoking, patient age, very young and very old • diabetes, surgery, neoplastic, pulmonary, renal or cardiac disease
Risk factors for infections with filamentous fungi • Exposure to construction activities • immunosuppressive conditions • AIDS, congenital immunodeficiencies • Dialysis, renal failure • Diabetic ketoacidosis • Mechanical ventilation • Smoking • Age of the patient - very young and very old
Risk factors for Legionnaires’ disease • Exposure to soil excavation during construction and malfunction of plumbing systems • Immunosuppressive conditions • Advanced age • Chronic pulmonary disease • Smoking • Excessive use of alcohol • Surgery • Diabetes, neoplastic disease, renal failure, cardiac failure
Risk assessment • Proactive approach • Minimise dust • Prevent dust infiltration into patient care areas adjacent to construction • Attention to plumbing system when disruptions occur • Infection control measures
Contract • Preventive measures outlined clearly before start of construction or renovation project • Maintenance of measures • Clear responsibilities
General guidelines • Minimise dust • Prevent migration of duct particles into adjacent areas • plastic barrier from floor to ceiling + negative pressurization • plastic barrier + high efficiency exhaust fan with HEPA filter • plastic barrier + portable exhaust fan with side-draft hood
Pre-construction • Consult infection control department • Authority to stop construction? • Identify essential services that may be disrupted • ICN to identify patient population at risk and implement appropriate preventive measures • Train contractors and workers • Traffic patterns determined for construction workers
Construction • Move immunosuppressed patients • Seal windows, doors, air intake and exhaust vents in areas adjacent to construction area • Dust barrier • Walk-off mat • Protective clothing • CIN to visit construction site regularly with project manager
Post construction • Construction zone thoroughly cleaned • ICN to check area before patients are re-admitted • Final walk-through inspection • Evaluate preventive measures and review effectiveness for any problems and positive outcome
Personnel interactions • Facility project manager,environmental services, medical and nursing staff • provide information on infection control concerns • education on importance of preventive measures • collaborate in making recommendations in cleaning • collaborate with staff to identify patients at risk
Personnel interactions • Architects, engineers, contractors, subcontractors, suppliers • ICN should be aware of existing building and professional standards that address infection control issues • communicate with them • ensure preventive measures are initiated and followed through
ICRA之定義 醫院整建前必須由多個單位共同評估出一個計畫,以降低整建過程對病患、訪客、及醫院工作人員造成之可能感染風險
ICRA計畫 • 由醫院多個單位共同依據醫院整建計畫訂出完整的ICRA • 必須由整建團隊提供給ICRA team的資料 • 建構計畫(Floor plan) • 機械設備、水電使用、及防火計畫(MEP: mechanical, electric, plumbing, fire protection) • 周邊環境影響評估(Surrounding environmental concerns ) • 工作範圍(Scope of work) • 工作時段及時數(Work hours) • 垃圾清運計畫(Debris removal plan) • 整建過程中醫院日常活動之動線規劃(Pathway to transport patients, visitors and staff during construction)
ICRA計畫 • 醫院整建團隊必須 • 充分了解並參予整個ICRA計畫之進行 • 提供ICRA所需的任何文件資料
步驟一:醫院整建過程中之感染風險評估 • TYPE A: 觀察型或非侵入型之整建 • 不牽涉任何乾燥壁面之侵入; • 移開天花板格板且只做觀察 • TYPE B: 小規模且工期小於72小時之工程,工程中只產生少量灰塵 • 牽涉切割牆壁或天花板但能有效移除灰塵之工程 • TYPE C: 較大規模且工期大於72小時之工程,工程中會產生中到大量灰塵 • 砌牆 • 長期工程且無法有效去除灰塵者 • TYPE D: 大型工程 • 大規模更動管路系統 • 新建或大規模改建工程
如果很多地方均有感染風險,必須找出最高風險區域如果很多地方均有感染風險,必須找出最高風險區域 步驟二: 找出最高風險區
醫院區域之風險分類 • 低度風險區域 • 非照顧病人之區域 • 非醫療區 (行政區域) 中度風險區 • 排除門診高風險區之外之其他門診區 • 病人聚集區 (e.g. 電梯等候區) • 醫療支援區域 (e.g. 廚房) 高度風險區 • 門診高風險區 • 腫瘤科 • 移植病人門診 • 胸腔科 • Cystic Fibrosis • 放射線科執行介入性醫療行為之處所Interventional Radiology • 導管室 • 所有住院病人區域
步驟三: 找出各區域之感染風險等級 將區域之感染風險與工程之感染風險進性綜合配對
步驟五: 工程結束後之清理工作 • 工作完畢後必須以HEPA filtered vacuum或濕拖把清理工作場所,並要經主管檢查合格才可完成 • 移除工作場所之空調系統並將之隔離處理 • 工程場所要回歸醫療使用前必須先作環境消毒,使用之消毒劑必須是醫療機構認可的
工程結束後之檢討 在整個工程結束後,整建單位、院感單位、及安全部門均必須對工程期間施工單位對於ICRA決定的落實程度進行評估,以對日後工程的進行提出建議
Air sampling • OTS • new, major renovation to ventilation system • air sampling for bacteria count • Immunosuppressed patients • Aspergillus surveillance
結論 • 乾淨的醫院環境是醫院安全很重要的一環 • 院感是每個人都該遵守的事 • 院感的達成必須要經由溝通良好的團隊共同完成 • 所有的工程案子均必須以相同手法執行評估
未來發展 • 除塵機具應標準化 • 醫院人員必須接受足夠的教育訓練 • 防塵計畫應予標準化 • 研發新的除塵機具與技術 • 充分運用新的產品與技術