510 likes | 651 Views
MSSP/Self-Certification. Plan Submission. IATO/ATO. Glossary. Parts of a SSP. 5 pt. 5 pt. 5 pt. 5 pt. 5 pt. 10 pt. 10 pt. 10 pt. 10 pt. 10 pt. 15 pt. 15 pt. 15 pt. 15 pt. 15 pt. 20 pt. 20 pt. 20 pt. 20 pt. 20 pt. 25 pt. 25 pt. 25 pt. 25 pt. 25 pt.
E N D
MSSP/Self-Certification Plan Submission IATO/ATO Glossary Parts of a SSP 5 pt 5 pt 5 pt 5 pt 5 pt 10 pt 10 pt 10 pt 10 pt 10 pt 15 pt 15 pt 15 pt 15 pt 15 pt 20 pt 20 pt 20 pt 20 pt 20 pt 25 pt 25 pt 25 pt 25 pt 25 pt
When submitting a plan to the ODAA the first 5 characters in the UID
LAN, WAN, Standalone Multiuser, Standalone Single-User, Peer-to-Peer
After the issuance of an IATO, within 180 days the ISSP must conduct an
Formal declaration by the DAA that an IT system is approved to operate.
The contractor employee responsible for the implementation of Automated Information Systems
An assembly of computer hardware, software , and firmware configured for the purpose of computing, storing, retrieving, displaying or otherwise manipulating classified data
Document(s) submitted by the WAN owner to the WAN DAA that describes the security features and requirements of the WAN
Official with the authority to formally assume the responsibility for operating a system or network at an acceptable level of risk.
Document stating the system operates in accordance with the approved MSSP/SSP and that the security features are implemented and operational
Form used to acknowledge the responsibilities associated with the use of an AIS