An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Engineering 380 Chapter 13 Owner Obligations

  2. Owner Obligations • Fee structure is determined by the project needs • A variety of compensation methods are legally valid • Cost and time methods • Multiple of direct salary expense • Multiple of direct personnel expense • Professional fee plus expense • Hourly rates

  3. Owner Obligations • Project attribute methods • Fixed sum • Percentage of total project cost • Multiple of billings • Square footage • Unit cost • Royalty

  4. Owner Obligations • Additional services and reimbursables can add to fee basis • Compensation (fee) should be based on risk, owner attitudes, and technical difficulty • Payment schedules are articulated in the contract: • interim • packages • monthly • late

  5. Owner Obligations • Failure to perform is usually considered a material breach and cause for damage recovery • Prevention or hindrance (owner won’t answer questions required to complete design) does not prevent recovery • Unjust enrichment and forfeiture are well-established legally (process is clear)

  6. Owner Obligations • Procedure for completion of design in alternative delivery or fast-track is not as clear • Financial exigency • Bankruptcy • Repudiation • Unwillingness or inability to perform (death of a partner)