An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Springbrook Creek Wetland and Habitat Mitigation Bank: Overview • Early Action • Site Selection • Proposal • Benefits

  2. Purpose: I-405/SR 167 Early Environmental Demonstration • Pilot EEI to be used by corridor program • Establish site selection criteria • Focus on aquatic resources, fish, wetlands, water quantity, floodplains • Provide refinements/improvements for corridor EEI

  3. Early Environmental Demonstration: Methodology • Evaluate Impacts • Compile Project List • Fatal Flaw • Second-level Criteria • “Short List” Top scoring sites

  4. Results to Implementation • Short-list “disappeared” during hold on projects • Continued talks with COR evolved from Springbrook Creek specific work to Wetland Mitigation Bank • Pitched idea to BOC • Nelson Side Channel—too close to impacts as design evolved

  5. Rationale for Site Selection • Limiting factors in watershed • Great opportunity in urban setting • NMFS: riparian not properly functioning • Juvenile survival • No LWD • Erosion/sedimentation • Degraded water quality • Lack of diversity, complexity • Non-native species • Loss of habitat in migratory corridor

  6. Existing Conditions(approx 2001) 1936 B A C E D

  7. Existing Conditions

  8. General Concept • WSDOT takes credit for road improvements • Renton uses credit for city projects, development • Permitted and Constructed as Separate Project

  9. General Concept • Re-establish 18 acres wetland • Rehabilitate 52 acres wetland • Enhance: 32.5 acres wetland and buffer • Coordinate/Integrate with surrounding land use • Make trail connection

  10. How will functions be improved? • 135,517 native plants will be planted • 50.5 acres invasive plants to be removed/monitored • 186 habitat structures

  11. Design Elements: Trail as part of Urban Banking List elements (water control, excavation, etc.) Insert zoomed in picture of C and E.