An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MIOSHA: ALL Trades

  2. Safety Program

  3. Hers His Hers His

  4. PPE Personal Protective Equipment

  5. Personal Protective Equipment Hard Hats-Employer Eye and Hearing Protection-Employer Rubber Boots-Employer Reflective Vests-Employer Fall Protection Equipment-Employer Steel Toe Boots-Employee Hand Protection-Employee Isolated Incidence Defense

  6. Equipment Issues

  7. Heavy Equipment Annual Inspections

  8. Oxygen Requirements Air is Oxygen Deficient whenever concentration is less than 19.5% Air is Oxygen enriched whenever concentration is greater than 23.5% 5 things that apply to all confined spaces

  9. Methane Carbon Monoxide Hydrogen Sulfide Carbon Dioxide Propane Chlorine Gasoline

  10. Best Practices Utility Locating under the Michigan Best Practices Contract The Michigan Best Practices contract runs exclusively for the benefit of MITA members who have executed a limited power of attorney in regard to the contract. The members of the Michigan Damage Prevention Board, of which MITA is a founding member, negotiated the Best Practices contract. If you are not a signatory MITA member, the remedies provided by the contract are not available to you. If you wish to participate, contact MITA at 800-878-2821.

  11. Prior to Excavating The MISS DIG System must be contacted at 800-482-7171at least 72 hours in advance of construction, but not more than 14 calendar days, excluding Saturdays, Sundays and holidays. Retain your ticket number and be specific about the limits concerning the proposed area of excavation. Positive Response All participating utility owners are required to notify MISS DIG via an automated response system. This useful tool will allow you to determine if all of the utilities in your proposed area of excavation have been located. If a utility owner has no facilities in the area, this information will also be part of the positive response. This information is administered by MISS DIG and available through

  12. No Marks If you have arrived at the proposed area of excavation and one of the following three conditions exists, MISS DIG should be notified of a potentially unmarked facility. Upon this notification the facility owner shall respond within 3 hours unless another time is mutually agreed upon. The three conditions are: * there is visible evidence of a facility(s), * a notified Underground Facility Owner failed to provide a positive response, or * there exists a positive response indicating a location was marked, but the marks are missing.

  13. Additional Assistance If the precise location of a marked facility cannot be determined and assistance is requested during normal working hours ( 7 a.m. to 5 p.m.) on a business day, the system facility owner has 3 hours to respond to the request or meet at a mutually agreed time. Requests for additional assistance must be made through MISS DIG: 800-482-7171.

  14. Excavating Excavating must commence within 14 daysof the dig start date on the MISS DIG ticket. If excavating has not occurred within this time frame, a new ticket number must be obtained prior to excavating.

  15. Portable Changeable Message Sign Lighted Arrow Lighted arrow has been either turned off or is non functioning. Incorrect use of PCMS. PCMS should not be used for business purposes.

  16. Barrel Spacing Correct Barrel Spacing as specified in the proposal.

  17. Channelizing Devices Substandard plastic drums.

  18. Conflicting Signs Detour sign though obscured, points to left while the sign on the right reads, “All Traffic MUST turn Right”. Our signs must never lie. Conflicting information.

  19. Temporary Signing Misleading information.

  20. Sign Bottom Height The minimum sign bottom heights in curbed areas is 7 feet.