1 / 3

XRT Team Meeting

XRT Team Meeting. Location: ISAC/ASDC September 17-18, 2003. PSU CALDB file status. CALDB items stored in Excel file Converted to FITS format under Linux/Solaris Managed with SCCS Sent via FTP to ISAC Bad Pixel Table Currently we have one hot pixel: (DETX, DETY) = (454, 391)

raya-walls
Download Presentation

XRT Team Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. XRT Team Meeting Location: ISAC/ASDC September 17-18, 2003 XRT Team Meeting – ASDC – September17-18, 2003 (Page 1)

  2. PSU CALDB file status • CALDB items stored in Excel file • Converted to FITS format under Linux/Solaris • Managed with SCCS • Sent via FTP to ISAC • Bad Pixel Table • Currently we have one hot pixel: • (DETX, DETY) = (454, 391) • Currently we have one partially blocked column: • DETX = 454 • DETY = 392 – 602 • Bad pixel table uploaded to instrument • Bad pixel tables sent to ISAC XRT Team Meeting – ASDC – September17-18, 2003 (Page 2)

  3. PSU CALDB file status • Linearity • Linearity fitted to Panter calibration data • Gain coefficients calculated, put into FITS format • FITS files sent to ISAC • NOTE: current definition of Gain file assumes linearity in energy • We may need to modify this to allow nonlinear energy response • Bias Information • Image mode: Amp 2, Low gain, 134 DN • Photodiode mode: Amp 1, High gain • 114.2 DN at Panter • 129.5 DN now • Not sure why this has changed • FITS files sent to ISAC • Background files • Data processing in progress at PSU • We expect background to be small – users can assume it is negligible for proposal purposes. XRT Team Meeting – ASDC – September17-18, 2003 (Page 3)

More Related