St. Peter Claver School Reconstruction & Rehabilitation Project 2009-2014. ST. PETER CLAVER SCHOOL: THE NEW VISION! A FIVE YEAR VISION. SCHOOL PROFILE. ESTABLISHED: SEPTEMBER 1862 POPULATION PRIMARY SCHOOL: 885 Students 439 Girls 446 Boys
E N D
St. Peter Claver School Reconstruction & Rehabilitation Project2009-2014
ST. PETER CLAVER SCHOOL: THE NEW VISION! A FIVE YEAR VISION
SCHOOL PROFILE ESTABLISHED: SEPTEMBER 1862 POPULATION PRIMARY SCHOOL: 885 Students 439 Girls 446 Boys PRESCHOOL: 27 Students 17 Girls 10 Boys TOTAL: 912 Students NUMBER OF BOYS: 456 NUMBER OF GIRLS: 456
SCHOOL PROFILE ESTABLISHED: SEPTEMBER 1862 POPULATION PRIMARY SCHOOL: 939 Students 470 Girls 469 Boys PRESCHOOL: 30 Students 19 Girls 11 Boys TOTAL: 969 Students NUMBER OF BOYS: 480 NUMBER OF GIRLS: 489
STAFF 2009-2010 1 Administrative Principal 2 Administrative Vice Principals 2 Preschool Teachers 35 Primary School Teachers (Infant 1-Standard 6)
Construct two two- storey concrete buildings with 28 new classrooms . • Construct two fences to secure the infrastructure of the school. • Rehabilitate 2 existing buildings with 13 classroom • Rehabilitate the existing school library • Provide furniture for the whole school • Improve the recreational facilities of the school.
PROJECT OVERVIEW PROJECT #1 PRESCHOOL Rehabilitation $60,000.00 Additional 3 classrooms for the Standard One $30,000.00 *Social Security to Pledge towards the project.
PROJECT OVERVIEW PROJECT #2 Construction of the first two- Storey 14 classroom building with principal’s office and bathrooms. Estimated cost Bze$1.3 M
PROJECT #3 Construction of the second two-Storey 14 classroom building with principal’s office and bathrooms. Estimated cost Bze$1.2 M
PROJECT #4 Construction of two fences Rehabilitation of 2 existing buildings Rehabilitation of existing library Estimated cost Bze$700,000
FURNITURE Estimated cost Bze$500,000 TOTAL........BZE $4,501,000
GROUND WORK • PROJECT PROPOSALS forwarded to various agencies • ENGINEER from BNE has visited • DISTRICT EDUCATION MANAGER has pledged support • VENEZUELAN AMBASADOR has visited • MINISTER OF EDUCATION has visited • AREA REPRESENTATIVE has visited • ENGINEER from MOE has visited • STAKEHOLDERS MEETING
Reconstruction of 14 classrooms two storey Building with Principal’s Office & Bathrooms Estimated Cost (Including Furniture): BZE $1.3 MILLION Funding Sources Identified : Belize Natural Energy SPCS Parent Teachers Association Management & Ministry of Education
MAIN STREET PRESCHOOL (3 Classrooms)
JOSE MARIA NUNEZ STREET STANDARD ONE (4 Classrooms)
JOSE MARIA NUNEZ STRRET INFANT TWO (4 Classrooms)
RECONSTRUCTION • INFANT TWO BUILDING: 4 CLASSROOMS • STANDARD ONE: 4 CLASSROOMS • PRESCHOOL: 3 CLASSROOMS
SCOPE OF WORK • Demolition of the existing buildings with special care given to the asbestos roof. • Closure of School (1 week) during demolition. • Purchasing of 11 temporary classroom buildings to house 370 students( a third of the total school population) over a one year period. • Construction of a new14 classroom 2 storey building with principal’s office and bathrooms.
Wiring of the new building • Installation of ceiling fans in the new classrooms • Painting of the new building • Furnishing of new classrooms
FURNITURE PRESCHOOL: 3 classrooms 50 armchairs 12 learning centre tables 2 teachers desks & chairs 3 bookshelves 3 cupboards 1 kitchenette with sink
INFANT TWO: 4 classrooms 120 armchairs 8 learning centre tables 4 teachers desks & 12 chairs 4 bookshelves 4 cupboards 4 chalk boards
STANDARD ONE: 4 classrooms 120 armchairs 8 learning centre tables 4 teachers desks & 12 chairs 4 bookshelves 4 cupboards 4 chalk boards
PRINCIPAL’S OFFICE Teachers’ Lounge & Print Room 1 Principal’s desk and 5 chairs 1 table to seat 20 teachers and 20 chairs for meetings and workshops 1 chalkboard 2 bookshelves 2 file cabinets 2 cupboards 1 kitchenette and sink
PRINT ROOM • 3 WALL TO WALL BOOK SHELVES • 1 COMPUTER STATION • 3 TABLES FOR RISOGRAPHS & PRINTERS • 2 CUPBOARDS TO STORE SUPPLIES
Reconstruction of 14 classrooms two storey Building with Principal’s Office & Bathrooms Estimated Cost (Including Furniture): BZE $1.2 MILLION Funding Sources Identified : VENEZUELAN GOVERNMENT SPCS Parent Teachers Association Management & Ministry of Education
MAIN STREET, STANDARD FIVE (6 Classrooms)
MAIN STREET, STANDARD Six (4 Classrooms)
RECONSTRUCTION OF TWO BUILDINGS MAIN STREET • STD V BUILDING: 6 CLASSROOMS • STD VI BUILDING: 4 CLASSROOMS
SCOPE OF WORK • Demolition of the existing buildings • Construction of a new14 classroom 2 storey building to accommodate (226 students) with principal’s office and bathrooms. • Wiring of the new building • Installation of ceiling fans in the new classrooms • Painting and furnishing of the new building
STANDARD FIVE: 6 classrooms 120 armchairs 12 learning centre tables 6 teachers desks & 18 chairs 6 bookshelves 6 cupboards 6 chalk boards
STANDARD 6: 4 classrooms 120 armchairs 8 learning centre tables 4 teachers desks & 12 chairs 4 bookshelves 4 cupboards 4 chalk boards
PRINCIPALS OFFICE Teachers Lounge 1 Principal’s desk and chair 1 table to seat 20 teachers and 20 chairs for meetings and workshops 1 chalkboard 2 bookshelves 2 file cabinets 2 cupboards
Rehabilitation of three buildings & Construction of fence School Library building Cost: BZE $700,000.00 Funding Partners: Social Investment Funding SPCS Parent Teachers Association Management & Ministry of Education
JOSE MARIA NUNEZ STREET PUNTA GORDA TOWN INFANT ONE (6 Classrooms)
Standard 2 & 3 (7 Classrooms)
REHABILITATION OF THREE BUILDINGS FRONT STREET • STD 2 & 3 BUILDING: 7 CLASSROOMS • INFANT I BUILDING: 6 CLASSROOMS • SCHOOL LIBRARY
INFANT ONE Total cost $31,524.13 (COST OF FURNITURE NOT INCLUDED) SCOPE OF WORK Change Windows Electrification Ceiling Fans (6 per class) Painting Installation of burglar bars
INFANT ONE: 6 classrooms 150 armchairs 12 learning centre tables 6 teachers desks & 18 chairs 6 bookshelves 6 cupboards 6 chalk boards
STANDARD 2 & 3 Total Cost $86,323.78 (COST OF FURNITURE NOT INCLUDED) SCOPE OF WORK • Change Windows • Electrification • Ceiling Fans (6 per class) • Painting • Installation of burglar bars
STANDARD 2 & 3: 8 classrooms 300 armchairs 16 learning centre tables 8 teachers’ desks & 24 chairs 8 bookshelves 8 cupboards 8 chalk boards
SCHOOL LIBRARY Total cost $31,524.13 (COST OF FURNITURE NOT INCLUDED) SCOPE OF WORK Change Windows Electrification Ceiling Fans (10) Painting of building Installation of burglar bars Replastering of outside walls Furnishing of library