1 / 16

CEM - 510

King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management. Important Causes of delay in Public Utility Projects in Saudi Arabia. CEM - 510. Presented By: Tariq Al-Wabil 20 December 2003. Authors: Mohamed I. Al-Khalil Mohamed A. Al-Ghafly.

Download Presentation

CEM - 510

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. King Fahd University of Petroleum and MineralsDepartment of Construction Engineering and Management Important Causes of delay in Public Utility Projects in Saudi Arabia CEM - 510 Presented By: Tariq Al-Wabil 20 December 2003 Authors: Mohamed I. Al-Khalil Mohamed A. Al-Ghafly Instructor: Dr. Soliman Al-Mohawis

  2. GUIDELINES • INTRODUCTION• PREVIOUS STUDIES• MAIN CAUSES OF DELAY• SUMMARY & CONCLUSION• Q & A Important Causes of delay in Public Utility Projects in Saudi Arabia

  3. ٱIntroduction Purpose: To determine the most important delay factors so that efforts can be made to control these factors. OWNER . CONSULTANT . GENERAL CONTRACTOR SUB CONTRACTOR MATERIAL SUPPLIER Important Causes of delay in Public Utility Projects in Saudi Arabia

  4. ٱPrevious Studies • 37% according to the contractors. • 84% according to the consultants. • 70% of Public Utility Projects subject to delay. • 39% of Original Project duration. Important Causes of delay in Public Utility Projects in Saudi Arabia

  5. ٱMain Causes of Delay • Six major Categories 1 - Contractor performance 2 - Owner administration 3 - Early planning and design 4 - Government regulations 5 - Site and environmental conditions 6 - Site supervision • Sixty Causes of Delay (Handout) Important Causes of delay in Public Utility Projects in Saudi Arabia

  6. ٱMain Causes of Delay • Material • Equipment • Manpower • Project management • Project Finance 1 - Contractor performance (1 - 29) Important Causes of delay in Public Utility Projects in Saudi Arabia

  7. ٱMain Causes of Delay • Slow decision making • Progress Payment • Coordination with other authorities 2 - Owner Administration (30 - 41) Important Causes of delay in Public Utility Projects in Saudi Arabia

  8. ٱMain Causes of Delay • Low qualification of A/E • Changes in the scope of the project 3 - Early Planning & Design (42 - 45) Important Causes of delay in Public Utility Projects in Saudi Arabia

  9. ٱMain Causes of Delay • Difficulty in obtaining work permits. • Tendering System 4 - Government Regulations (46 - 49) Important Causes of delay in Public Utility Projects in Saudi Arabia

  10. ٱMain Causes of Delay • Different from area to another • Site survey by the contractor • Work interference by Contractor 5 - Site & Environmental Conditions (50 - 54) Important Causes of delay in Public Utility Projects in Saudi Arabia

  11. ٱMain Causes of Delay • Qualification of Consultant Engineer’s Staff. • Submittal Approval • Inspection & Testing 6 - Site Supervision (55 - 60) Important Causes of delay in Public Utility Projects in Saudi Arabia

  12. ٱSUMMARY & CONCLUSION • Cash flow Problem • Work Permits. • Tendering System Important Causes of delay in Public Utility Projects in Saudi Arabia

  13. Degrees Financial Limits of Saudi Contractor Important Causes of delay in Public Utility Projects in Saudi Arabia

  14. Contractor Classification Certificate Important Causes of delay in Public Utility Projects in Saudi Arabia

  15. Q & A Important Causes of delay in Public Utility Projects in Saudi Arabia

  16. Thank You Important Causes of delay in Public Utility Projects in Saudi Arabia

More Related