1 / 3

Round 1 Debrief - am

Round 1 Debrief - am. More folders Reallocate work to op 1 Change batch size/contents Make folders color agnostic Eliminate unnecessary paper work Eliminate stamping operation Quality at the source Takt times – 24 sec. (w), 40 sec. (g). Round 2 changes - am.

rea
Download Presentation

Round 1 Debrief - am

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Round 1 Debrief - am • More folders • Reallocate work to op 1 • Change batch size/contents • Make folders color agnostic • Eliminate unnecessary paper work • Eliminate stamping operation • Quality at the source • Takt times – 24 sec. (w), 40 sec. (g)

  2. Round 2 changes - am • Reallocate work between stations - station 1 (kiting + steps 1-5) - station 2 (steps 6-8)- station 3 (step 9 + inspect height w/jig)- station 4 (stamp w/jig + oven) • Adjust plant layout- Listen to casey and stephen (get it right!) • Look downstream(Work only when downstream station is empty) • Assign new roles

  3. Round 2 Debrief - am • OP3 builds to orders - kanban card from sales(yellow sticky note from Isaac) • Create FIFO lane (mixed color) upstream of ovens • Ovens handle mixed color boats • Vendor controlled inventory

More Related