STAR Time Meeting Report April 08, 2014 Salvatore Fazio. UPTIME. ~ 83 %. successful week for STAR Uptime 83% (was 79 % as of April 1 st ). R unning strategy. High initial rates  Three trigger configurations for physics:

reegan
Download Presentation

UPTIME

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STAR Time Meeting ReportApril08, 2014Salvatore Fazio UPTIME ~83% • successful week for STAR • Uptime 83% (was79% as ofApril1st) S. Fazio

  2. Running strategy • High initial rates Threetrigger configurations for physics: • High lumi (ZDC > 55 kHz) :PXL + IST taken out (we pump di-muon, photon triggers) • Mid Lumi (ZDC 55-40 kHz) and Low (ZDC 40 kHz) : PXL + IST in (priority gradually given to HFT program) Current Projections on reaching Data Set Goals (luminosity program) di-muon L2 gamma Current projections now largely exceed our expectations for rear events program S. Fazio

  3. Current Projections onData Set Goals (minimum bias) Hours/day PXL #evts PXL+IST Good uptime (ZDC < 55 Hz) in the past week for our HFT program 19 h stores? That’s nice! HFT min-bias Collisions Central PXL • Last week projection  we can catch up with our goals if continue running with enough uptime • Central PXL still falling short S. Fazio

  4. HFT -PXL status HFT part of routine operations with very few issue that requires expert intervention PXL operational parameters have been optimized Including Latch-up threshold, and reset of ladders The performance of the and status of inner ladders have stabilized. No change since ~ 3/30 Graph shows dead/bad (black,red) and good,usable (green, blue) as determined by QA for inner ladder 3/30 4/8 S. Fazio

  5. Track Pointing (DCA) resolution [TPC+IST+PIXEL] Au+Au 200GeV/c preliminary DCA-XY [cm] DCA-Z [cm] 50 μm 1/p [GeV/c]-1 1/p [GeV/c]-1 MCS term • Lines are fits to function: Vertex, Detector and Mis-Alignment Resolution terms Data from March 22 S. Fazio