1 / 6

Henry C. Tamanini Chief, Technological Hazards Pennsylvania Emergency Management Agency

Pennsylvania Update. Henry C. Tamanini Chief, Technological Hazards Pennsylvania Emergency Management Agency January 21, 2010. Plan Architecture Emergency Operations Plan (EOP) Basic Plan Supporting Plans Mitigation Plan Mass Casualty Plan Incident Specific Plans

reese
Download Presentation

Henry C. Tamanini Chief, Technological Hazards Pennsylvania Emergency Management Agency

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pennsylvania Update Henry C. Tamanini Chief, Technological Hazards Pennsylvania Emergency Management Agency January 21, 2010

  2. Plan Architecture • Emergency Operations Plan (EOP) • Basic Plan • Supporting Plans • Mitigation Plan • Mass Casualty Plan • Incident Specific Plans • Nuclear / Radiological Plan • Influenza Pandemic Plan • Heat Wave Plan • Others as needed

  3. Incident Specific Plan

  4. TMI Plume Exercise • Proposed Bell Bend Combined Operating License • Request for Additional Information • Comments on Proposed FEMA Material • TMI Steam Generator Replacement Project • KI Replacement – 5 EPZs • New Dosimetry – KI Video for EWs • November ’09 – Limerick Plume • January – Peach Bottom (MD) • February – EMAP Evaluation • April – Beaver Valley Plume • June – Peach Bottom Plume (PA) • October – Susquehanna Plume • HSEEP – REP Toolkit

  5. REP “Full-Compliment” • 3 Planners • 1 Training Coordinator • 1 GIS Technician • 1 REP HSEEP Exercise Coordinator • 1 REP Equipment Coordinator • 1 Plan Coordinator • 1 Clerical • 1 Supervisor

  6. Challenges for 2010 • Enterprise Wide Plan, Procedure and Training Revisions per Bell Bend R A I s • Enterprise Wide Plan, Procedure and Training Revisions per new FEMA Regulations and Guidance • HSEEP Toolkit • Planning for the 2011 Limerick Post Plume Exercise • WebEOC

More Related