1 / 0

The State of Energy Resources and Supply in Nigeria - Challenges, Constraints and Opportunities

Dr. David Ige Group Executive Director, Gas & Power NNPC. The State of Energy Resources and Supply in Nigeria - Challenges, Constraints and Opportunities. April 24, 2012. Nigerian Association of Energy Economics Sheraton, Abuja. Outline. Overview of the Nigerian Oil & Gas Industry

renate
Download Presentation

The State of Energy Resources and Supply in Nigeria - Challenges, Constraints and Opportunities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dr. David Ige Group Executive Director, Gas & Power NNPC The State of Energy Resources and Supply in Nigeria- Challenges, Constraints and Opportunities April 24, 2012 Nigerian Association of Energy Economics Sheraton, Abuja
  2. Outline Overview of the Nigerian Oil & Gas Industry Supply Perspective & Challenges Investment Opportunities Conclusion
  3. Overview of the Nigerian Oil & Gas Industry- Huge Resource Base Abundant oil and gas reserves base. Natural Gas Reserves Crude Oil Reserves
  4. Our Aspiration for Oil Grow crude oil reserves from 35bn bbls to 40bn bbls Refocus efforts on exploration both in existing and frontier basins Grow production capacity from about 2mmb/d to 3mmb/d Arrest decline in mature assets through increased work-over and secondary development activity Accelerate new field development plans Ensure better linkage of the sector’s activity with the wider economy, leveraging the National Content law
  5. Our Aspiration for Natural Gas Strategic Themes of Gas Master Plan High Value Export Regional Pipelines LNG Gas to Power Gas Based Industrialisation “… By 2014, we would have positioned Nigeria firmly as the undisputed regional hub for gas-based industries such as fertilizer, petrochemicals and methanol.” Deliver Gas for at least threefold increase in generation capacity by 2015 Consolidate Nigeria’s position and market share in high value export markets Regional gas pipelines – consolidate national footprint and influence Deliver on President’s Gas Revolution Agenda to: Create regional hub for gas-based industries – fertilizer, petrochemical and methanol Transform gas sector to value adding sector
  6. Projection of Domestic Energy Demand Socio-economic data on Nigeria point to an era of sustained energy demand growth, either for vehicular use, industrialization or for electricity generation
  7. Outline Overview of the Nigerian Oil & Gas Industry Supply Perspective & Challenges Investment Opportunities Conclusion
  8. Crude Oil and Condensate Production Profile High production decline rates in PSC operations
  9. Unprecedented Growth Requirement in Gas Sector Delivering the aspiration translates to an aggressive growth which is unprecedented. In reality, a brand new industry is being created from scratch at a pace which challenges the pace of gas supply development, delivery of physical infrastructure and stability of the market
  10. Short Term Gas Supply to Power - West Area Based on current projections, the shortfall in supply in the Western Area for 2012 is estimated at about 400mmcf/d by end year
  11. Medium Term Power Sector Gas Demand/Supply Profile Similarly in the medium term, will align demand with supply. The deficit in 2016 could be bridged with possible acceleration of the Odidi development slated currently for about 2018
  12. Challenges of Supply Commercial : Evolution to free market Deregulation Market led gas pricing Infrastructure Capital Human Capacity Industry Structure – Oil vs Oil & Gas Industry
  13. Enabling Policy Thrust The aspiration is supported by a set of enabling policy interventions which are already being implemented
  14. Critical Pipeline Infrastructure
  15. Western Gas Infrastructure 1n 2011, we focused on reinforcing and expanding the Western supply infrastructure 1 2 OBEN – GEREGU GAS SUPPLY TO OLORUNSHOGO 36” x 136km; Project completed in 2011 Gas supply to Geregu power plant and access for gas to the North 24” x 31km; Line Pipes procured and all lengths welded Project to be completed by May 2012 6 WESTERN CPF / OBEN –KOKO PIPELINE 2 4 1 3 Tech configuration completed by Kellogs Ready to commence Pre-FEED ELPS A 24”/36” x 104km; Project progressing steadily with issues being addressed 6 3 5 4 OBIAFU-OBRIKUM-OBEN (OB3) ELPS 2 36” x 324km; Doubling pipeline capacity to 2 bscfd to support the growing demand in the West Construction about to commence 48” x 127km; Contract about to be awarded; completion in 2013/2014
  16. Capital Expenditures JV + PSC JV only Significant number of new oil and gas projects provide opportunity to rationalize for greater efficiency High finding, development, and production costs continue to be a challenge in the conventional and deepwater environments. Capital costs will average $13.9 billion and $6.1 billion per annum in the JV and PSC operations respectively, in the 2011 to 2015 period.
  17. Stimulating Demand – Gas Based Industrialization- Koko FTZ Gas Industrial Complex Our gas based industrialisation agenda is kicking off with the Koko FTZ project in Delta State. This will be Africa’s largest gas industrial city when completed Petrochemical Plant Fertilizer Plant Anchor Investments 1.3MT/400KTPA PE/PP Plant Xenel of Saudi Arabia Largest Plant in Africa 2*1.3MTPA Fertilizer Plant Nagarjuna of India Critical Foundation Projects Central Processing Facility FTZ Infrastructure Port Infrastructure
  18. Outline Overview of the Nigerian Oil & Gas Industry Supply Perspective & Challenges Investment Opportunities Conclusion
  19. Investment Opportunities GAS TRANSMISSION PIPELINES 1 FINANCIAL SERVICES 7 2 UPSTREAM GAS DEVELOPMENT 6 PIPE MILLING AND FABRICATION YARDS $16 Billion Investment Opportunity 3 5 LNG & LPG PLANTS KOKO FTZ INFRASTRUCTURE, PORT INFRASTRUCTURE & REAL ESTATE DEVELOPMENT 4 GAS PROCESSING FACILITY / GAS BASED MANUFACTURING INDUSTRIES
  20. Outline Overview of the Nigerian Oil & Gas Industry Supply Perspective & Challenges Investment Opportunities Conclusion
  21. Conclusion Demand growth is and will continue to be unprecedented Supply will always be the challenge tempering broad demand growth Next 5-8 years are critical in addressing key structural issues impacting supply Good progress so far, but momentum needs to be sustained Significant scope for explosive growth thereafter
More Related